電力電纜施工的安全措施范文
時(shí)間:2024-01-03 18:09:56
導(dǎo)語(yǔ):如何才能寫(xiě)好一篇電力電纜施工的安全措施,這就需要搜集整理更多的資料和文獻(xiàn),歡迎閱讀由公務(wù)員之家整理的十篇范文,供你借鑒。
篇1
關(guān)鍵字:電力電纜機(jī)械化敷設(shè)
Highway communications systems functional analysis and development forward
Yang Huanli
Road and Bridge Construction and Development Co., Ltd. Guangdong Branch Road up to
Summary: highway communication system is the basis of its overall mechanical and electrical systems and platforms, is charging and monitoring system of information transmission channel. Including fiber optic digital transmission systems, program-controlled digital switching systems, emergency telephone system, image data transmission system, optical communication cables and power system engineering. The function of the system analysis and development of vision can see from the article.
Keywords: Highway; communication system; functional analysis; Preview
一、引言
在大型電廠及城市網(wǎng)架設(shè)計(jì)中,考慮線(xiàn)路交叉,規(guī)劃布局等影響,在電廠及城市中心等許多場(chǎng)合都采用220kV及以上大截面交聯(lián)聚乙烯絕緣電纜、充油紙絕緣電纜代替高壓架空線(xiàn),電纜一般采用溝直埋敷設(shè)方式。由于220kV及以上大截面電力電纜直徑一般都在10cm以上,重量在20-30kg/m,人工敷設(shè)時(shí)安全及施工質(zhì)量無(wú)法得到保障,較多采用機(jī)械化敷設(shè),結(jié)合部分電廠220kV、500kV電纜使用牽引機(jī)機(jī)械化敷設(shè)的工作經(jīng)驗(yàn),對(duì)大直徑電力電纜機(jī)械化敷設(shè)應(yīng)用作一下說(shuō)明。
二、組織施工流程及工藝要求
1、組織施工流程
機(jī)械化敷設(shè)電力電纜的施工流程見(jiàn)圖
2、施工準(zhǔn)備
2.1 技術(shù)準(zhǔn)備
2.1.1電纜敷設(shè)前須具備的書(shū)面性資料應(yīng)齊全,包括電纜敷設(shè)圖、電纜溝(隧道)或直埋路徑的施工圖及電纜的廠家資料,發(fā)現(xiàn)資料有問(wèn)題或有疑義時(shí),及時(shí)提出,由設(shè)計(jì)單位或廠家以書(shū)面形式進(jìn)行書(shū)面澄清。
2.1.2電纜敷設(shè)前必須辦齊各種施工依據(jù),主要包括設(shè)計(jì)交底紀(jì)要、開(kāi)工許可報(bào)告、施工工作票等。
2.1.3技術(shù)人員應(yīng)根據(jù)有關(guān)規(guī)定編制好切合實(shí)際的施工作業(yè)指導(dǎo)書(shū)或施工方案,并經(jīng)監(jiān)理、業(yè)主等相關(guān)審批。重點(diǎn)做好施工前的整體施工質(zhì)量策劃,對(duì)電纜的牽引強(qiáng)度、側(cè)壓力應(yīng)進(jìn)行精確計(jì)算以確定牽引機(jī)的速度、牽引強(qiáng)度,明確、統(tǒng)一質(zhì)量標(biāo)準(zhǔn)和要求。并由技術(shù)負(fù)責(zé)人在施工前向施工人員進(jìn)行交底,由技術(shù)負(fù)責(zé)人指導(dǎo)作業(yè)指導(dǎo)書(shū)(方案)的實(shí)施。
2.2 施工作業(yè)勞動(dòng)力準(zhǔn)備
機(jī)械化敷設(shè)大直徑電纜也需要較多的人力進(jìn)行配合,電纜的敷設(shè)施工需要有良好的組織系統(tǒng),并且分工明確,統(tǒng)一指揮,行動(dòng)一致,才能使敷設(shè)工作順利進(jìn)行。一般,大型電纜敷設(shè)作業(yè)現(xiàn)場(chǎng)要求設(shè)有豐富施工經(jīng)驗(yàn)和管理水平的總指揮一人,電纜施放、電纜維護(hù)、牽引敷設(shè)、牽引機(jī)控制、質(zhì)量安全監(jiān)督檢查、檢查試驗(yàn)等若干人。
2.3 主要機(jī)工具及材料準(zhǔn)備
2.3.1主要機(jī)工具包括吊機(jī)、電纜牽引機(jī)、電纜盤(pán)支架、對(duì)講機(jī)、滑輪、電纜割刀、試驗(yàn)設(shè)備等。
2.3.2主要材料包括電纜頭封端、電纜固定夾具、絕緣熱縮帶、三防雨布、麻繩鋼絲等。
3、施工前應(yīng)滿(mǎn)足作業(yè)條件
3.1 電纜路徑圖紙和電纜廠家資料已經(jīng)通過(guò)審核,施工所須具備的書(shū)面性資料已完成,如開(kāi)工報(bào)告、施工方案、安全措施、應(yīng)急預(yù)案等;
3.2 施工人員組織落實(shí)到位,并已進(jìn)行安全質(zhì)量和技術(shù)交底,施工人員應(yīng)明確各自的任務(wù)及相關(guān)技術(shù)、質(zhì)量、安全的要求;
3.3 電纜敷設(shè)路徑已具備敷設(shè)條件,對(duì)于施工現(xiàn)場(chǎng)已經(jīng)完成的電纜溝、孔洞、支架等建筑進(jìn)行核對(duì),并通過(guò)檢查驗(yàn)收,敷設(shè)路徑沿線(xiàn)周邊場(chǎng)地已經(jīng)清理,敷設(shè)路徑中防止電纜損傷的措施已落實(shí);
3.4 電纜牽引機(jī)完好,各類(lèi)工具、材料備料完成; 牽引機(jī)合理布置完成,牽引速度、整體聯(lián)動(dòng)調(diào)試完成,滑輪沿電纜敷設(shè)路徑合理布置完成;
3.5 電纜施放位置已選定,并清理整頓完成,符合施放條件;
3.6 電纜兩端具備電纜擱置條件,如腳手架搭設(shè)、電纜終端架的安裝已完成,并通過(guò)檢查驗(yàn)收;
3.7 電纜已到貨,并通過(guò)出庫(kù)的外觀檢查,條件具備應(yīng)進(jìn)行試驗(yàn)檢查,合格后倒運(yùn)至施放點(diǎn)。
3.8 施工范圍內(nèi)須辦理工作票的工作已結(jié)束,安全措施已落實(shí),并得到允許施工的許可。
4、作業(yè)工序
大型電力電纜一般采用單相形式,下面以單根電纜敷設(shè)為例做主要工序說(shuō)明。
4.1 電纜盤(pán)上支架:一般采用流動(dòng)吊機(jī)將電纜盤(pán)放置于支架上,應(yīng)注意起吊過(guò)程中電纜避免收到擠壓等損傷,電纜盤(pán)距離地面高度應(yīng)在合適位置。就位時(shí)保證電纜盤(pán)朝向正確。
4.2 電纜檢查和試驗(yàn):電纜盤(pán)及電纜表面無(wú)破損,電纜絕緣電阻等試驗(yàn)符合規(guī)范或廠家要求。充油電纜油壓滿(mǎn)足廠家或規(guī)范要求
4.3 安裝張力計(jì)和防捻器:在電纜盤(pán)兩端安裝張力計(jì),以監(jiān)視敷設(shè)過(guò)程中電纜牽引力,必要時(shí)在電纜牽引頭前安裝防捻器
4.4 拉出電纜施放始端:套上牽引網(wǎng)套、電纜牽引護(hù)套或用麻繩纏繞綁扎在電纜上拉拽電纜,不得損傷電纜;拉拽電纜時(shí)用力應(yīng)控制在電纜牽引力范圍內(nèi)。
4.5 牽引電纜:電纜牽引速度不宜超過(guò)15m/min,復(fù)雜路徑、穿管、電纜終端敷設(shè)時(shí)應(yīng)放慢速度。電纜牽引必須保持同步,牽引強(qiáng)度應(yīng)符合要求。電纜應(yīng)放在牽引機(jī)或滑輪上進(jìn)行牽引,避免電纜直接摩擦地面和支架。電纜牽引時(shí)應(yīng)避免電纜扭轉(zhuǎn)。電纜轉(zhuǎn)彎處的側(cè)壓力應(yīng)符合制造廠規(guī)定。
4.6 敷設(shè)到位后整理電纜:電纜到位后從電纜的一端開(kāi)始有次序地整理。整理過(guò)程防止檫傷電纜,電纜放置整齊合理。電纜放置位置正確。
4.7 電纜兩端固定:電纜兩端按要求固定在腳手架或電纜終端架上,電纜擱置牢固。切斷電纜時(shí)不應(yīng)有金屬屑和污物進(jìn)入電纜。電纜兩端應(yīng)按要求留有必要的裕度。
4.8 清理現(xiàn)場(chǎng):已敷設(shè)電纜路徑內(nèi)應(yīng)無(wú)雜物,符合驗(yàn)收條件。
4.9檢查驗(yàn)收:對(duì)已敷設(shè)完工的電纜按規(guī)范或廠家要求進(jìn)行檢查和試驗(yàn)。檢查和試驗(yàn)合格后應(yīng)進(jìn)行書(shū)面簽證。直埋電纜回土前應(yīng)經(jīng)隱蔽工程驗(yàn)收合格,回填應(yīng)符合相關(guān)要求。
5、質(zhì)量工藝標(biāo)準(zhǔn)
5.1電纜敷設(shè)應(yīng)符合DL/T 5161.1~5161.17-2002 《電氣裝置安裝工程質(zhì)量檢驗(yàn)及評(píng)定規(guī)程》、DL 5009.1-2002《電力建設(shè)安全工作規(guī)程第1部分:火力發(fā)電廠》、DL453-1991《高壓充油電纜施工工藝規(guī)程》、GB50168-2006 《電氣裝置安裝工程電纜線(xiàn)路施工及驗(yàn)收規(guī)范》、《工程建設(shè)標(biāo)準(zhǔn)強(qiáng)制性條文 電力工程部分》(2006年版)相關(guān)條款的要求。
5.2電纜敷設(shè)前后的檢查試驗(yàn)應(yīng)符合GB50150-2006《電氣裝置安裝工程 電氣設(shè)備交接試驗(yàn)標(biāo)準(zhǔn)》和廠家的相關(guān)要求。
5.3電纜的牽引強(qiáng)度宜符合GB50168-2006 《電氣裝置安裝工程電纜線(xiàn)路施工及驗(yàn)收規(guī)范》表5.1.10附錄A規(guī)定,充油電纜最大牽引力不應(yīng)超過(guò)27kN,110kV以上電纜轉(zhuǎn)彎處應(yīng)符合制造廠規(guī)定,當(dāng)無(wú)規(guī)定時(shí)不應(yīng)大于3 kN /m。
5.4電纜敷設(shè)前應(yīng)做好質(zhì)檢計(jì)劃并通過(guò)審批,施工過(guò)程嚴(yán)格執(zhí)行質(zhì)檢計(jì)劃,做好各類(lèi)記錄和簽證。
5.5施工前應(yīng)做好整體質(zhì)量策劃,對(duì)常見(jiàn)的質(zhì)量通病應(yīng)有針對(duì)性措施,并落實(shí)到責(zé)任人或單位。施工過(guò)程中最主要的是控制電纜外表不產(chǎn)生機(jī)械損傷,確保電纜敷設(shè)后的試驗(yàn)數(shù)據(jù)符合相關(guān)要求。
6、安全措施及注意事項(xiàng)
6.1電纜敷設(shè)時(shí)應(yīng)符合DL 5009.1-2002《電力建設(shè)安全工作規(guī)程第1部分:火力發(fā)電廠》、DL5009.3-1997《電力建設(shè)安全工作規(guī)程 (變電所部分)》、國(guó)家電網(wǎng)安監(jiān)[2009]664號(hào)《國(guó)家電網(wǎng)公司安全工作規(guī)程》的相關(guān)條款的要求。
6.2嚴(yán)格遵守施工安全規(guī)程及業(yè)主的有關(guān)要求和規(guī)定。
6.3所有施工人員不得隨意擅自變動(dòng)或更換,未經(jīng)安全、質(zhì)量、技術(shù)交底的人員不得參與電纜敷設(shè)。
6.4任何施工人員不得隨意移動(dòng)或拆除施工現(xiàn)場(chǎng)的安全設(shè)施和安全隔離設(shè)施。
6.5嚴(yán)格執(zhí)行工作票制度,須事先按照要求辦理好工作票,并進(jìn)行工作票交底及檢查工作票安全措施的落實(shí)情況。
6.6施工前應(yīng)根據(jù)現(xiàn)場(chǎng)實(shí)際情況,組織由安全員、技術(shù)員、施工指揮、主要施工組負(fù)責(zé)人等參加對(duì)施工中潛在的危險(xiǎn)源進(jìn)行辨析及制定相應(yīng)措施,并形成書(shū)面資料進(jìn)行全員交底。
6.7 因大型電纜連盤(pán)總重基本在10T以上,且施工環(huán)境一般情況下都不是特別理想,在施工時(shí)主要的工作危險(xiǎn)源為以下一些:
電纜倒運(yùn)、吊裝過(guò)程中,電纜盤(pán)固定不牢傷人;
電纜盤(pán)支架支撐不穩(wěn)或支架基礎(chǔ)不穩(wěn),電纜盤(pán)傾覆傷人;
電纜敷設(shè)時(shí)施工人員處于電纜轉(zhuǎn)彎內(nèi)側(cè),電纜擠傷人員;
電纜敷設(shè)電纜壓傷施工人員手腳,電纜切割時(shí)割傷手腳;
牽引機(jī)使用不規(guī)范或固定不牢傷人;
腳手架搭設(shè)不牢或未進(jìn)行必要的載荷計(jì)算驗(yàn)證,發(fā)生倒塌等事故;
上架子或上高空未掛或不正確使用安全帶導(dǎo)致高空墜落;
電纜試驗(yàn)時(shí)未做好安全隔離發(fā)生傷人。
針對(duì)以上的主要危險(xiǎn)點(diǎn)需要有明確的防范措施加以控制。
三、成品保護(hù)、文明施工措施
(1)施工完成后宜沿電纜敷設(shè)路徑按一定距離設(shè)置成品保護(hù)牌。電纜線(xiàn)路周?chē)?米范圍內(nèi)為電纜線(xiàn)路保護(hù)區(qū)。在電纜線(xiàn)路保護(hù)區(qū)內(nèi),禁止進(jìn)行臨時(shí)性建筑,必須修建時(shí)應(yīng)采取有效的防護(hù)措施,宜建立工作票制度。
(2)電纜線(xiàn)路上應(yīng)完善各種安全通道、設(shè)施及永久性建筑設(shè)施,電纜溝、空洞蓋板、電纜回填土、通過(guò)電纜路徑的馬路等,利于保護(hù)電纜。
(3)在直埋電纜線(xiàn)路保護(hù)區(qū)內(nèi),應(yīng)禁止重型機(jī)械或汽車(chē)在非道路電纜線(xiàn)路保護(hù)區(qū)內(nèi)作業(yè)或通過(guò)。
(4)在電纜保護(hù)區(qū)內(nèi)禁止堆放易燃、易爆品,對(duì)電纜有害的腐蝕品,鋼錠等重型物品,積土、垃圾等雜物。
(5)施工現(xiàn)場(chǎng)工具及材料要做到定置管理,堆放整齊。
(6)電纜敷設(shè)宜在現(xiàn)場(chǎng)設(shè)置施工標(biāo)志牌,標(biāo)明工程名稱(chēng)、施工單位班組、施工負(fù)責(zé)人、質(zhì)量安全員等,以便責(zé)任到人,利于監(jiān)督。
(7)施工結(jié)束應(yīng)及時(shí)清理現(xiàn)場(chǎng),清除余土、垃圾、多余材料等雜物,做好“工完、料凈、場(chǎng)地清”的工作。
(8)驗(yàn)收合格后立即進(jìn)行電纜覆蓋或相關(guān)永久性保護(hù)措施落實(shí),以免不必要的損傷的產(chǎn)生。
四、電纜敷設(shè)注意事項(xiàng)
進(jìn)行電纜敷設(shè)時(shí)應(yīng)注意以下幾個(gè)方面問(wèn)題:(1)電纜敷設(shè)前加強(qiáng)對(duì)電纜敷設(shè)人員的安全和技術(shù)培訓(xùn),確保施工質(zhì)量和施工安全。(2)電纜敷設(shè)人員的安排計(jì)劃。電纜敷設(shè)時(shí)可根據(jù)實(shí)際情況進(jìn)行,將敷設(shè)人員分成幾個(gè)不同工作組,做到統(tǒng)一指揮,分工明確,以加快敷設(shè)的速度。(3)應(yīng)注意電纜敷設(shè)的準(zhǔn)確性與美觀性。電纜敷設(shè)工藝的不在事后的修改,關(guān)鍵在過(guò)程中的控制,力保敷設(shè)過(guò)程一次成優(yōu)。
參考文獻(xiàn):
[1]《電力工程達(dá)標(biāo)投產(chǎn)管理辦法》(2006年版)
[2]《國(guó)家電網(wǎng)公司輸變電工程施工工藝示范手冊(cè)》(變電工程分冊(cè) 電氣部分)
篇2
關(guān)鍵詞 電力電纜;結(jié)構(gòu);材質(zhì);敷設(shè)方式;阻燃措施
中圖分類(lèi)號(hào):TM726 文獻(xiàn)標(biāo)識(shí)碼:A 文章編號(hào):1671-7597(2014)03-0103-02
隨著電能逐漸滲入我們的生活,由電引發(fā)的災(zāi)難也逐漸增加,據(jù)統(tǒng)計(jì)在過(guò)去十年發(fā)生的重大電氣火災(zāi)中,因電氣線(xiàn)路引發(fā)的火災(zāi)比例占到了將近一半。因此,進(jìn)行電力電纜敷設(shè)方式和阻燃措施的研究,對(duì)保障人民生命安全,減少?lài)?guó)家財(cái)產(chǎn)損失具有重要意義。
1 電力電纜的結(jié)構(gòu)和材質(zhì)
1)導(dǎo)體。導(dǎo)體是電纜傳輸電能的通道,它應(yīng)該具有較高的導(dǎo)電性能和足夠的機(jī)械強(qiáng)度,不容易被氧化和腐蝕,容易生產(chǎn)和連接等。常用的導(dǎo)電材料有銅、鋁等金屬,特殊情況下也用合金或其他金屬,如鋁鎂硅合金等。
2)耐火層。耐火層包覆在導(dǎo)體表面,使用的主要材料是云母。云母具有良好的耐高溫性、電氣絕緣性,光滑富有彈性易加工,是極佳的耐火阻燃材料。
3)絕緣層。絕緣層用以將導(dǎo)體與相鄰導(dǎo)體及保護(hù)層隔離,一般要求有較高的物理絕緣、防潮和耐熱性能。電力電纜從絕緣層的材料類(lèi)型可分為油浸紙絕緣電力電纜、塑料絕緣電力電纜和橡皮絕緣電力電纜。塑料絕緣電力電纜常用的塑料有聚氯乙烯、聚乙烯、交聯(lián)聚乙烯。橡皮絕緣電力電纜的絕緣層為橡膠加上各種調(diào)配劑,經(jīng)過(guò)充分混煉后擠包在導(dǎo)電線(xiàn)芯上,經(jīng)過(guò)加溫硫化而成。常用作絕緣的膠料有天然膠-丁苯膠混合物,乙丙膠、丁基膠等。
4)屏蔽層。交變的電場(chǎng)和磁場(chǎng)是分不開(kāi)的兩種場(chǎng),在運(yùn)行的電力電纜周?chē)厝淮嬖谥艌?chǎng),而這種磁場(chǎng)會(huì)對(duì)周邊的電磁環(huán)境產(chǎn)生影響,會(huì)對(duì)其他的電子設(shè)備產(chǎn)生不良的干擾,因此在電力電纜中會(huì)設(shè)計(jì)屏蔽層。屏蔽層是用金屬材料,主要有銅編織帶、鋁編織帶、鋼帶等。在接線(xiàn)時(shí)通常會(huì)把屏蔽層接地,這樣也可以在電纜芯線(xiàn)發(fā)生破損時(shí)提供電流通路,可以起到一定的保護(hù)作用,減小事故范圍。
5)填充層。電纜的填充物起一定的絕緣作用,另外為了填滿(mǎn)導(dǎo)線(xiàn)間的空隙,穩(wěn)定電纜結(jié)構(gòu)。填充層主要采用阻燃型非吸濕性聚丙烯(PP)網(wǎng)狀撕裂膜,并采用阻燃玻璃布以重疊繞包的方式扎緊。
6)內(nèi)護(hù)層。為了防止線(xiàn)芯絕緣層受機(jī)械損傷,需要在鎧裝層內(nèi)側(cè)包裹內(nèi)護(hù)層。這還能使絕緣層不會(huì)與水、空氣或其他物體觸摸,避免絕緣層受潮絕緣度降低。最廣泛采用的內(nèi)護(hù)套為塑料、橡皮護(hù)套二種。
7)鎧裝層。鎧裝層通常使用金屬帶,比如鋼帶、鋁帶等,能增加電纜的機(jī)械強(qiáng)度,防碾壓和外部機(jī)械損傷,也可以防老鼠等動(dòng)物啃咬。此外,鎧裝層如果正確接地,也可以起到一定的屏蔽作用,還能夠在電纜遭到雷擊時(shí)起到保護(hù)作用。
8)外護(hù)層。電纜的外護(hù)套的主要作用是防護(hù),所用的原料主要有塑料和橡膠,其中塑料類(lèi)常用有聚氯乙烯、聚乙烯等。電纜的外護(hù)套不但可以提高電纜的絕緣水平,還可以保護(hù)電纜的內(nèi)部各層,使電纜內(nèi)部材質(zhì)與外部環(huán)境隔離,穩(wěn)固電纜的結(jié)構(gòu),提高電纜的延展性,提高電纜防化學(xué)腐蝕、防水浸人、阻止電纜燃燒等技術(shù)性能,從而擴(kuò)展電纜的使用環(huán)境范圍,減小了敷設(shè)難度。
2 電力電纜的敷設(shè)
1)電力電纜敷設(shè)的基本規(guī)定。電纜的類(lèi)型和使用環(huán)境不同,應(yīng)該遵循不同的規(guī)定,應(yīng)該遵循便于敷設(shè)、方便維護(hù)、環(huán)境安全、成本最低的要求。
同一通道內(nèi)的電纜數(shù)量比較多的情況下,同一側(cè)的電力電纜應(yīng)該分層架設(shè),并且要按由高到低的電壓等級(jí)順序排列。單芯電力電纜用于交流電能輸送時(shí),要考慮電壓相序的放置位置和不同相的電纜間的間距,要使得電纜的金屬防護(hù)層感應(yīng)電壓不超過(guò)允許值標(biāo)準(zhǔn),電纜的線(xiàn)徑選擇也要根據(jù)實(shí)際負(fù)荷的持續(xù)工作電流的大小確定。
明敷的電力電纜不應(yīng)該平行敷設(shè)在熱力管道的上部,除執(zhí)行GB50289外,還應(yīng)滿(mǎn)足電纜與熱力管道平行時(shí)間距應(yīng)等于或大于1 m,交叉時(shí)間距應(yīng)等于或大于0.5 m。
在隧道、溝槽、豎井、夾層等封閉式電力電纜通道中,不能有熱力管道、易燃?xì)怏w或易燃液體的管道穿越。電纜以及管或溝穿過(guò)墻或板的孔洞應(yīng)用非可燃性材料封堵。
在有行人通過(guò)的各類(lèi)建筑設(shè)施的路面或隧洞中,電纜不能敞露式敷設(shè)。
2)電力電纜的敷設(shè)方式。
①地下直埋敷設(shè):直埋電纜雖然施工簡(jiǎn)單方便,但也要按嚴(yán)格的安全措施和技術(shù)工藝進(jìn)行施工,否則會(huì)造成電纜的直接或間接損壞。施工前必須進(jìn)行現(xiàn)場(chǎng)實(shí)地勘察,畫(huà)好電纜走向圖,盡量避開(kāi)高溫地段和帶有化學(xué)物質(zhì)的土壤。在城市中敷設(shè)還要考慮與其他線(xiàn)路及管道的允許距離,確保安全。電纜埋入地下的深度不應(yīng)小于0.7 m,多條電纜應(yīng)考慮不能重疊;②保護(hù)管敷設(shè):保護(hù)管敷設(shè)比較安全可靠,能防止電纜受腐蝕性氣體的侵蝕和機(jī)械損傷,更換方便。保護(hù)管主要有鋼管和塑料管兩大類(lèi)。鋼管主要是焊接管和電線(xiàn)管。塑料管種類(lèi)較多,最常用的保護(hù)管有塑料玻璃鋼復(fù)合管、MPP改性聚丙烯電力電纜保護(hù)管、塑合金電力電纜保護(hù)管等。這些保護(hù)管所使用的主要材料以聚乙烯樹(shù)脂為原料,有聚氯乙烯、聚丙烯、氯化聚氯乙烯等;③構(gòu)筑物敷設(shè):電纜構(gòu)筑物應(yīng)該按照需要敷設(shè)的全部電纜的數(shù)量確定尺寸,構(gòu)筑的空間應(yīng)能滿(mǎn)足方便敷設(shè)施工和巡視維護(hù)時(shí)人員活動(dòng)的需要。電纜溝道內(nèi)安裝的支架層間距離應(yīng)該留足,可以方便電纜敷設(shè)、固定和放置接頭。若在一層放置多根電纜時(shí),要考慮更換電纜或增設(shè)接頭所需要的空間。隧道底部應(yīng)設(shè)置縱向排水邊溝。電纜溝的溝壁和蓋板,應(yīng)牢固耐用,能夠承受一定重量和長(zhǎng)久抵抗所處環(huán)境的侵蝕。隧道的安全孔間距在工業(yè)廠區(qū)或變電所內(nèi)不宜大于75 m。在城市區(qū)域內(nèi),開(kāi)挖式的隧道安全孔的間距不應(yīng)大于200 m,對(duì)于非開(kāi)挖式的隧道安全孔應(yīng)綜合考慮隧道的深度、敷設(shè)電纜種類(lèi)數(shù)量和消防通風(fēng)需要等因素合理設(shè)置;④水下敷設(shè):水中電纜敷設(shè)環(huán)境特殊,為了保障電纜能穩(wěn)定可靠運(yùn)行,一般要求水流速度小、河底穩(wěn)固、河岸耐沖刷的河段。電纜在水下敷設(shè)時(shí)應(yīng)該把電纜埋在水底泥沙中,埋設(shè)深度在通航水道中,淺水區(qū)應(yīng)大于0.5 m,深水航道應(yīng)大于2 m,并需要添加覆蓋以穩(wěn)固保護(hù)。電纜不應(yīng)敷設(shè)在碼頭、渡口、水工構(gòu)筑物附近。單芯電纜在非通航河道且水流速度不超過(guò)1 m/s的河中,相同回路的線(xiàn)間距離不能小于0.5 m,不同回路的線(xiàn)間距離不能小于5 m。水下電纜的兩岸,應(yīng)設(shè)置醒目的警告標(biāo)志。
3 電力電纜的防火阻燃措施
1)電力電纜的起火原因。電纜隧道內(nèi)有雜物堆積,電纜的表面或電纜橋架上有較厚的灰塵,有可燃?xì)怏w、可燃液體泄漏到隧道內(nèi)等,在高溫或明火引燃時(shí),引發(fā)火情或爆炸。
電纜距離熱源較近,或者長(zhǎng)期超負(fù)荷運(yùn)行,外部高溫或電纜導(dǎo)線(xiàn)產(chǎn)生的熱量造成電纜絕緣材料老化,導(dǎo)致絕緣性能下降,發(fā)生絕緣擊穿,引起火情。
電纜在電纜敷設(shè)時(shí)防護(hù)層遭到損壞,或者電纜在運(yùn)行中絕緣層受到機(jī)械損傷,引起電纜絕緣擊穿。
電纜中間接頭工藝不合格,線(xiàn)頭壓接不緊,焊接不牢,使接頭逐漸發(fā)生氧化,接觸電阻增大,使導(dǎo)線(xiàn)發(fā)熱量增加,破壞了電纜的絕緣性能,造成絕緣擊穿。電纜接頭制作工藝不符合要求、表面積污或受損,潮氣入浸,造成絕緣擊穿,起火爆炸。電纜頭瓷套管破裂或引出線(xiàn)的相間距離過(guò)小,導(dǎo)致發(fā)生閃絡(luò)起火。
2)電纜絕緣材料燃燒產(chǎn)生的有害影響。電力電纜所使用的絕緣層都是些含有可燃性的橡膠、聚氯乙烯等有機(jī)化合物,這類(lèi)的物質(zhì)在燃燒時(shí)所產(chǎn)生的熱量達(dá)19000 kJ/kg~46000 kJ/kg。而電纜絕緣層的熔點(diǎn)卻遠(yuǎn)遠(yuǎn)低于這些數(shù)值,如聚氯乙烯塑料熔點(diǎn)僅為120℃。電弧的溫度在1000℃~8000℃,一旦電纜出現(xiàn)放電現(xiàn)象將極易引燃絕緣物質(zhì)。
絕緣材料的燃燒會(huì)產(chǎn)生大量的有毒、有害氣體,諸如氯化氫、一氧化碳等,會(huì)造成人窒息、中毒,危及生命。鹵化物氣體經(jīng)燃燒反應(yīng)會(huì)生成強(qiáng)烈的酸霧,會(huì)對(duì)人、物、環(huán)境造成進(jìn)一步傷害,還會(huì)造成電子設(shè)備受到強(qiáng)酸侵蝕,危害也相當(dāng)大。
3)電力電纜的防火阻燃措施。參照相關(guān)標(biāo)準(zhǔn)合理選擇電纜型號(hào),科學(xué)規(guī)劃避免超負(fù)荷運(yùn)行。嚴(yán)格把關(guān)電纜頭的制作質(zhì)量,防止電纜頭受潮或達(dá)不到絕緣要求。按規(guī)范進(jìn)行周期性電纜和回路中斷路器及開(kāi)關(guān)的測(cè)試,及早消除隱患。電纜溝要保持干燥,防止積水,避免電纜受潮,造成絕緣降低,引起短路。定期排除電纜上的積塵,防止所積粉塵自燃引起電纜著火。電纜敷設(shè)時(shí)要符合相關(guān)規(guī)定。配備必要的滅火器材、安全用具等,制定合理科學(xué)的應(yīng)急預(yù)案。
用耐火材料封堵電纜在穿過(guò)墻壁、盤(pán)底、豎井時(shí)的孔洞,防止電纜著火時(shí),高溫?zé)煔鈹U(kuò)散和伸張?jiān)斐苫馂?zāi)面擴(kuò)大。在電纜層間設(shè)置耐熱隔火板,防止電纜層間竄燃。在電纜通道設(shè)置分段隔墻和防火門(mén),防止電纜竄燃,擴(kuò)大火情。
4)阻燃電纜的發(fā)展前景。近年來(lái),隨著高層建筑的高度和數(shù)量不斷增加,安全需求也隨之提高,新建設(shè)的大樓基本都采用了新型的阻燃耐火型電纜,這些電纜主要是使用氟塑料來(lái)替代含氫的塑料,利用其耐高溫和不延燃等特性來(lái)減少火災(zāi)隱患。還有高溫超導(dǎo)電纜,其電能輸送能力超過(guò)普通電纜3至5倍,損耗低重量輕,特別是沒(méi)有火災(zāi)隱患,可廣泛應(yīng)用于短距離的電能傳輸場(chǎng)合。
4 總結(jié)
總之,我們的生產(chǎn)和生活越來(lái)越多的依賴(lài)于電能,在越來(lái)越龐大的電力傳輸網(wǎng)絡(luò)中使用阻燃耐火的環(huán)保型電纜,對(duì)防火安全和綠色環(huán)保具有重要的作用和推廣意義。
參考文獻(xiàn)
[1]白玉岷.電纜的安裝敷設(shè)及運(yùn)行維護(hù)[M].機(jī)械工業(yè)出版社,2011.
[2]GB50217-2007 電力工程電纜設(shè)計(jì)規(guī)范[S].人民出版社,2008.
篇3
關(guān)鍵詞:一體化教學(xué) 行動(dòng)導(dǎo)向教學(xué)法 教學(xué)質(zhì)量
【中圖分類(lèi)號(hào)】G【文獻(xiàn)標(biāo)識(shí)碼】B【文章編號(hào)】1008-1216(2015)07C-0050-03
電力電纜施工運(yùn)行與維護(hù)是高壓輸配電線(xiàn)路施工運(yùn)行與維護(hù)專(zhuān)業(yè)的專(zhuān)業(yè)核心課程,該課程介紹電纜的基礎(chǔ)知識(shí)和電纜的安裝、施工以及運(yùn)檢崗位工作任務(wù)訓(xùn)練等內(nèi)容,是支撐電力電纜工這一電力線(xiàn)路工種的核心專(zhuān)業(yè)課程。通過(guò)該課程的學(xué)習(xí),要使學(xué)生從對(duì)電力電纜陌生的階段發(fā)展到掌握電纜施工、運(yùn)檢崗位相關(guān)知識(shí),達(dá)到電力電纜中級(jí)工水平;要求學(xué)生不僅掌握電力電纜的相關(guān)知識(shí),還要掌握電纜的安裝、施工和運(yùn)檢等相關(guān)技能。
電力電纜施工運(yùn)行與維護(hù)課程在傳統(tǒng)授課模式下,理論課與實(shí)踐操作課分開(kāi)進(jìn)行,容易導(dǎo)致理論與實(shí)踐脫節(jié)。一方面,學(xué)生在理論課堂上由于興趣、積極性以及自制力等原因,學(xué)習(xí)效率較低;另一方面,在實(shí)習(xí)實(shí)訓(xùn)中,由于未能理解相關(guān)知識(shí)點(diǎn),內(nèi)容枯燥、方式單一,實(shí)操技能無(wú)法得到有效鍛煉,最終會(huì)嚴(yán)重影響教學(xué)質(zhì)量。
為了解決理論和實(shí)踐脫節(jié)的問(wèn)題,高職院校普遍引入了理實(shí)一體化教學(xué)模式。該模式打破傳統(tǒng)的教學(xué)體系和教學(xué)方法,根據(jù)職業(yè)教育培養(yǎng)目標(biāo)的要求重新整合教學(xué)資源,不但增強(qiáng)了教學(xué)的直觀性,而且充分體現(xiàn)了學(xué)生主體參與作用。理實(shí)一體化教學(xué)中,除了對(duì)教師隊(duì)伍、教材、教學(xué)場(chǎng)地有新的要求外,還有一項(xiàng)重要內(nèi)容:一體化課程建設(shè)。它讓師資、教材、教學(xué)場(chǎng)地諸要素有機(jī)組合起來(lái),是一體化教學(xué)順利實(shí)施的關(guān)鍵。在探索一體化課程建設(shè)的實(shí)施方法中,高職電力電纜施工運(yùn)行與維護(hù)課程教學(xué)中運(yùn)用了行動(dòng)導(dǎo)向教學(xué)法,不僅有效提高了電力電纜施工運(yùn)行與維護(hù)的教學(xué)質(zhì)量,還為一體化教學(xué)模式的順利實(shí)施提供參考和借鑒。
一、行動(dòng)導(dǎo)向教學(xué)法
行動(dòng)導(dǎo)向教學(xué)法(Handlungs Orientierter Unterricht)的核心內(nèi)容是:學(xué)生是學(xué)習(xí)過(guò)程的中心,教師是學(xué)習(xí)過(guò)程的組織者與協(xié)調(diào)人,遵循“信息、計(jì)劃、決策、執(zhí)行、檢驗(yàn)、評(píng)價(jià)”這一完整的“行為”過(guò)程序列,在教學(xué)中教師與學(xué)生互動(dòng),讓學(xué)生通過(guò)“獨(dú)立地獲取信息、獨(dú)立地制定計(jì)劃、獨(dú)立地執(zhí)行計(jì)劃、獨(dú)立地評(píng)價(jià)計(jì)劃”,在自己“動(dòng)手”的實(shí)踐中,掌握職業(yè)技能和專(zhuān)業(yè)理論知識(shí),從而構(gòu)建屬于自己的經(jīng)驗(yàn)和知識(shí)體系。
與傳統(tǒng)教學(xué)法相比,行動(dòng)導(dǎo)向教學(xué)法把學(xué)生放在教學(xué)的中心位置,教師是組織者和協(xié)調(diào)者,幫助學(xué)生去學(xué)習(xí),在教學(xué)中重視“案例”教學(xué),重視“解決實(shí)際問(wèn)題”及“自我管理式的學(xué)習(xí)”。行動(dòng)導(dǎo)向教學(xué)包含多種具體的教學(xué)方法,主要有案例教學(xué)法、項(xiàng)目教學(xué)法、任務(wù)教學(xué)法、模擬教學(xué)法、情景教學(xué)法、談話(huà)教學(xué)法、角色扮演法等。行動(dòng)導(dǎo)向教學(xué)法遵循學(xué)習(xí)過(guò)程中的客觀規(guī)律,以學(xué)生為中心,采用活動(dòng)引導(dǎo)的方式,側(cè)重結(jié)合傳授知識(shí)來(lái)培養(yǎng)學(xué)生的創(chuàng)新能力,激發(fā)學(xué)生積極主動(dòng)地掌握知識(shí)和技能,使學(xué)生學(xué)會(huì)學(xué)習(xí),為學(xué)生的可持續(xù)發(fā)展奠定了基礎(chǔ)。
行動(dòng)導(dǎo)向教學(xué)法可以有效解決目前高職院校中課堂教學(xué)和實(shí)踐教學(xué)脫節(jié)問(wèn)題。以長(zhǎng)沙電力職業(yè)技術(shù)學(xué)院高壓輸配電線(xiàn)路施工運(yùn)行與維護(hù)專(zhuān)業(yè)(簡(jiǎn)稱(chēng)輸配電線(xiàn)路專(zhuān)業(yè))為例,主要為電力線(xiàn)路建設(shè)安裝、運(yùn)維崗位培養(yǎng)技術(shù)技能型人才,對(duì)學(xué)生的實(shí)際操作技能有著較高的要求,為了他們未來(lái)職業(yè)發(fā)展,還要培養(yǎng)他們分析問(wèn)題、解決問(wèn)題、自我學(xué)習(xí)的能力。同時(shí)要求他們具備較高的防觸電、防高空作業(yè)危險(xiǎn)等安全意識(shí),規(guī)范操作、團(tuán)隊(duì)協(xié)作的職業(yè)素質(zhì)。行動(dòng)導(dǎo)向教學(xué)法通過(guò)實(shí)物、案例、圖片、視頻、現(xiàn)場(chǎng)實(shí)際操作、角色扮演演練不同崗位角色工作,用相對(duì)直觀的內(nèi)容增加學(xué)生的學(xué)習(xí)積極性,以最快的速度引導(dǎo)學(xué)生入門(mén),通過(guò)大量項(xiàng)目訓(xùn)練,使學(xué)生具備崗位工作能力。同時(shí)在任務(wù)實(shí)施過(guò)程中規(guī)范工作流程,要求學(xué)生嚴(yán)格遵守作業(yè)安全規(guī)定,指導(dǎo)學(xué)生開(kāi)展工作過(guò)程內(nèi)容學(xué)習(xí),從而切實(shí)提高學(xué)生的動(dòng)手能力和職業(yè)技能。
二、行動(dòng)導(dǎo)向教學(xué)法在電力電纜施工運(yùn)行與維護(hù)課程教學(xué)中的應(yīng)用
以輸配電線(xiàn)路專(zhuān)業(yè)的核心課程電力電纜施工運(yùn)行與維護(hù)課程為例進(jìn)行行動(dòng)導(dǎo)向教學(xué)法實(shí)施說(shuō)明,理論與實(shí)踐相結(jié)合。首先,教師要充分發(fā)揮學(xué)生的主體作用,明確主導(dǎo)作用;根據(jù)教學(xué)內(nèi)容,可采用演練法、歸納法、案例分析法、任務(wù)驅(qū)動(dòng)法等多種教學(xué)方法,激發(fā)學(xué)生學(xué)習(xí)興趣,提高教學(xué)質(zhì)量;教學(xué)過(guò)程采用“六階段教學(xué)法”,即按照明確任務(wù)、計(jì)劃、決策、實(shí)施、控制、評(píng)估反饋六個(gè)階段實(shí)施。
在電力電纜施工運(yùn)行與維護(hù)課程中實(shí)施行動(dòng)導(dǎo)向教學(xué)法時(shí),充分利用了長(zhǎng)沙電力職業(yè)技術(shù)學(xué)院的各種教學(xué)條件和實(shí)訓(xùn)場(chǎng)地,營(yíng)造真實(shí)的職業(yè)環(huán)境,將專(zhuān)業(yè)教學(xué)課堂變成工作現(xiàn)場(chǎng),引入行業(yè)規(guī)程規(guī)范、技術(shù)標(biāo)準(zhǔn)、工作流程實(shí)施典型工作任務(wù)進(jìn)行教學(xué),這樣可以提高學(xué)生的課堂專(zhuān)注力,增強(qiáng)職業(yè)意識(shí),培養(yǎng)職業(yè)能力。
以電力電纜施工運(yùn)行與維護(hù)課程中學(xué)習(xí)任務(wù)――10KV電力電纜頭制作教學(xué)為例:設(shè)置現(xiàn)場(chǎng)的具體情境、布置任務(wù)、講解理論、操作實(shí)施。按行動(dòng)導(dǎo)向教學(xué)法,教學(xué)任務(wù)的實(shí)施可按如下步驟:
(1)教師先布置任務(wù)。某供電公司所屬某電纜分接箱內(nèi)電纜頭發(fā)生故障,要求進(jìn)行更換。學(xué)生要完成制作一個(gè)10KV電力電纜戶(hù)內(nèi)熱縮終端頭的工作。
(2)要求學(xué)生分組進(jìn)行資料學(xué)習(xí)并給出工作計(jì)劃,制定作業(yè)指導(dǎo)書(shū)。提供學(xué)生要學(xué)習(xí)的一些資料,包括如何進(jìn)行終端頭制作的視頻,終端頭制作的說(shuō)明書(shū)及相關(guān)規(guī)程,學(xué)生通過(guò)學(xué)習(xí)明確工作任務(wù),制作工作計(jì)劃書(shū),編寫(xiě)作業(yè)指導(dǎo)書(shū)。要求將制作過(guò)程分解,理解每個(gè)操作步驟的工藝要求,自我評(píng)估給出每個(gè)步驟的練習(xí)時(shí)間;同時(shí)開(kāi)展小組間討論,了解每個(gè)操作環(huán)節(jié)與終端頭質(zhì)量的關(guān)系,進(jìn)行事故預(yù)想,思考在工作中可能會(huì)遇到的問(wèn)題并記錄。
(3)在任務(wù)開(kāi)始之前,教師要對(duì)學(xué)生的計(jì)劃進(jìn)行審核,咨詢(xún)每組練習(xí)時(shí)間規(guī)劃的原因,適當(dāng)進(jìn)行調(diào)整,并按他們的要求提供工(器)具及材料,并指出每樣工(器)具的功能。對(duì)每個(gè)小組提出的操作步驟不理解的地方進(jìn)行解答,然后隨機(jī)提問(wèn)小組的成員,確保每位同學(xué)明確工作任務(wù)和要求。但對(duì)于一些不具備危險(xiǎn)性、在操作中容易犯錯(cuò)誤或更好地操作手法,如果學(xué)生沒(méi)有提就留到他們?cè)趯?shí)施中遇到了、思考過(guò)了再給出,這樣可以加深他們的印象,在采用新工藝制作的成品更好時(shí)也會(huì)產(chǎn)生更大的成就感。
(4)制作前,每位同學(xué)要明確工作過(guò)程的危險(xiǎn)點(diǎn)和預(yù)控措施,并做好安全措施。制作過(guò)程中,由各組組長(zhǎng)分工,三人一小組(兩人操作,一人監(jiān)護(hù)),一般一個(gè)組有2~3個(gè)小組,每個(gè)小組輪流進(jìn)行每個(gè)操作步驟的演練,然后小組成員轉(zhuǎn)換角色輪流參與演練。在給定的時(shí)間里,記錄每位同學(xué)操作的次數(shù),確保技能訓(xùn)練時(shí)間。由于每作時(shí)間不長(zhǎng),學(xué)生空閑的時(shí)間不多,有利于改善工位不足;學(xué)生也沒(méi)有持續(xù)重復(fù)勞動(dòng),不容易產(chǎn)生厭倦。對(duì)每位同學(xué)每個(gè)操作的質(zhì)量要進(jìn)行點(diǎn)評(píng),確保教學(xué)實(shí)效。教師要對(duì)教學(xué)實(shí)施進(jìn)行把握,確保作業(yè)的安全性。在工作結(jié)束后,要分組討論總結(jié),并由組長(zhǎng)記錄;教師還要求學(xué)生口述操作流程,作為衡量本項(xiàng)目課堂教學(xué)效果的因素之一。
(5)在整個(gè)任務(wù)前期準(zhǔn)備和實(shí)施過(guò)程中,教師起到了一個(gè)引導(dǎo)的作用,引導(dǎo)學(xué)生查閱資料,明確任務(wù)要求,做好相關(guān)場(chǎng)地、工(器)具、人員準(zhǔn)備,在制作過(guò)程中及時(shí)糾正學(xué)生的不規(guī)范行為,保證整個(gè)任務(wù)的順利進(jìn)行。教師按真實(shí)的工作崗位要求嚴(yán)格要求學(xué)生,可以培養(yǎng)他們良好的職業(yè)習(xí)慣,加深他們對(duì)任務(wù)內(nèi)容、流程的理解。
(6)任務(wù)完成后,師生應(yīng)該共同對(duì)整個(gè)操作中的關(guān)鍵點(diǎn)、難點(diǎn)進(jìn)行歸納總結(jié),通過(guò)一些實(shí)際操作的案例加深學(xué)生的印象;再以這個(gè)實(shí)踐操作的任務(wù)為基礎(chǔ),通過(guò)多媒體教學(xué)手段,結(jié)合實(shí)物、視頻,拓展到其他類(lèi)型電纜附件的制作上,讓學(xué)生自我學(xué)習(xí),舉一反三。
由此可見(jiàn),應(yīng)用行動(dòng)導(dǎo)向教學(xué)法融合了演練法、案例分析法和任務(wù)驅(qū)動(dòng)法等多種教學(xué)方法,以達(dá)到教學(xué)目標(biāo),使“教”與“學(xué)”兩者有機(jī)地結(jié)合在一起。教學(xué)容量大、掌握速度快、學(xué)生合作參與積極性高、知識(shí)掌握效益高,大大豐富了教學(xué)的形式和手段,全面提高了學(xué)生的綜合能力。
在長(zhǎng)沙電力職業(yè)技術(shù)學(xué)院推行的基于行動(dòng)導(dǎo)向教學(xué)方法的電力電纜施工運(yùn)行與維護(hù)課程在試點(diǎn)班級(jí)實(shí)施一年后,據(jù)多家電力線(xiàn)路建設(shè)安裝、運(yùn)維單位反映,新畢業(yè)的學(xué)生在專(zhuān)業(yè)知識(shí)和動(dòng)手能力方面有了較為顯著的提高。學(xué)生在中級(jí)工的技能考試過(guò)級(jí)率也有明顯提高。該方法在提高高職教學(xué)質(zhì)量方面效果明顯,激發(fā)了學(xué)生的學(xué)習(xí)興趣,調(diào)動(dòng)了積極性,學(xué)生對(duì)新知識(shí)、新技能可以快速掌握。
三、結(jié)束語(yǔ)
實(shí)施理實(shí)一體化教學(xué)是解決目前高職教育中理論和實(shí)踐脫節(jié)這一問(wèn)題的必然選擇,而行動(dòng)導(dǎo)向教學(xué)法為理實(shí)一體化教學(xué)提供了方法基礎(chǔ)。 (下轉(zhuǎn)54頁(yè))
(上接51頁(yè))本文通過(guò)對(duì)行動(dòng)導(dǎo)向教學(xué)法在電力電纜施工運(yùn)行與維護(hù)課程中的應(yīng)用分析,對(duì)行動(dòng)導(dǎo)向教學(xué)法的內(nèi)涵、核心以及實(shí)際操作步驟有了深入分析,為其進(jìn)一步推廣應(yīng)用奠定了方法基礎(chǔ)。
行動(dòng)導(dǎo)向教學(xué)法的實(shí)施,還需要進(jìn)一步明確教師在教學(xué)中的角色定位,向教學(xué)過(guò)程的策劃者、管理者和主持人的角色轉(zhuǎn)變,轉(zhuǎn)變教學(xué)思維模式,進(jìn)一步提高自身修養(yǎng),加強(qiáng)與學(xué)生的互動(dòng)。
同時(shí),學(xué)校還應(yīng)進(jìn)一步整合教學(xué)資源以滿(mǎn)足一體化教學(xué)的需要,加強(qiáng)基于一體化教學(xué)的教材建設(shè),做好硬件和軟件的配套工作。
基金項(xiàng)目:湖南省教育科學(xué)規(guī)劃課題(XJK012CZJ004)
參考文獻(xiàn):
[1]崔維響,宮小飛,王磊.基于“行動(dòng)導(dǎo)向”的高職院校計(jì)算機(jī)應(yīng)用基礎(chǔ)課程教學(xué)研究[J].科技信息,2012(21).
[2]顧.基于行動(dòng)導(dǎo)向的道路工程綜合實(shí)踐課程構(gòu)建[J].電力職業(yè)技術(shù)學(xué)刊,2009(12).
篇4
【關(guān)鍵詞】電力工程施工技術(shù) 電纜敷設(shè) 建筑工程質(zhì)量管理
作為整個(gè)國(guó)家不斷發(fā)展的核心保障,電力系統(tǒng)在其中的作用是不言而喻的。因此電網(wǎng)的安全可靠對(duì)于目前國(guó)家經(jīng)濟(jì)的發(fā)展,人均生活水平的提高都扮演著重要的角色。在目前的電網(wǎng)建設(shè)過(guò)程中,電纜的鋪設(shè)是整個(gè)電力施工系統(tǒng)的重中之重,因?yàn)殡娎|的施工質(zhì)量將直接影響電網(wǎng)通電后的安全問(wèn)題。因此在電網(wǎng)的鋪設(shè)過(guò)程中,一旦因?yàn)槭┕べ|(zhì)量出了問(wèn)題對(duì)整個(gè)電網(wǎng)工程來(lái)講將是極大的打擊,輕者導(dǎo)致大范圍的緊急停電,重者將會(huì)直接導(dǎo)致火災(zāi)或者是人員傷亡。因此對(duì)電纜的鋪設(shè)質(zhì)量要求就格外嚴(yán)格。
1在電纜敷設(shè)過(guò)程中最常見(jiàn)的幾個(gè)問(wèn)題
1.1電纜敷設(shè)路徑的問(wèn)題
在目前國(guó)內(nèi)的電力系統(tǒng)施工過(guò)程中,對(duì)電纜的敷設(shè)一般都是經(jīng)過(guò)極其嚴(yán)格周密的科學(xué)計(jì)劃以及計(jì)算才會(huì)進(jìn)行敷設(shè)施工。但是若不經(jīng)過(guò)測(cè)量與計(jì)算就盲目的施工,一味追求鋪設(shè)的最短路徑,而且在敷設(shè)的過(guò)程中也忽視了其他的自然因素對(duì)電纜所能造成的影響,隨著施工完畢,年深日久在多種本可避免的原因下,電纜的老化會(huì)越發(fā)嚴(yán)重,從而大大增加了電網(wǎng)的故障與危險(xiǎn)事故的發(fā)生幾率。
1.2截面選擇的問(wèn)題
目前國(guó)內(nèi)的一些電纜敷設(shè)中,很多都是未經(jīng)科學(xué)計(jì)算就盲目選擇了截面,而這所造成的后果就是一旦電纜在使用過(guò)程中遇到溫度上升、損失電壓的情況時(shí)就極易發(fā)生故障。因此很多的電纜在敷設(shè)過(guò)程中,都是未做好相應(yīng)的調(diào)查與試驗(yàn),因此這些電纜在未來(lái)通電使用過(guò)程中不斷產(chǎn)生各種的問(wèn)題。
1.3忽視電纜敷設(shè)實(shí)驗(yàn)
隨著目前我國(guó)的電網(wǎng)范圍逐漸增加,電網(wǎng)敷設(shè)時(shí)所遇到的自然環(huán)境因素也越發(fā)的復(fù)雜,電纜在敷設(shè)成功后將面臨多種的自然威脅,這就使得原本的規(guī)定安全數(shù)據(jù)變得不可靠。基于此,在電纜敷設(shè)施工結(jié)束后一定要進(jìn)行輻射后的實(shí)驗(yàn)。但是目前國(guó)內(nèi)多是在敷設(shè)竣工后忽視掉電纜的敷設(shè)實(shí)驗(yàn),因此這就為未來(lái)電網(wǎng)的安全運(yùn)行造成了極大的影響。
1.4施工材料質(zhì)量不過(guò)關(guān)
在電纜的敷設(shè)過(guò)程中電纜的終端鏈接頭與中間鏈接頭的制造與安裝,對(duì)整個(gè)電力施工的最終質(zhì)量起到?jīng)Q定性的因素。在目前據(jù)相關(guān)報(bào)道顯示中國(guó)目前的電纜故障中有超過(guò)一半的故障事故是因?yàn)椴缓细竦闹虚g頭造成的。.
2應(yīng)對(duì)電纜敷設(shè)問(wèn)題的措施
2.1在整體施工前的控制
在進(jìn)行實(shí)際的破土動(dòng)工施工時(shí)一定要做好相關(guān)的前期準(zhǔn)備工作,首先需要對(duì)電纜施工中所使用的電纜的規(guī)格、型號(hào)進(jìn)行相關(guān)的核對(duì),然后檢查電纜表面是否存在損壞的情況,然后仔細(xì)閱讀相關(guān)的施工設(shè)計(jì)圖,從而保證施工員在施工時(shí)是嚴(yán)格遵照施工圖進(jìn)行施工的。同時(shí)根據(jù)相關(guān)的敷設(shè)規(guī)定,需要將敷設(shè)的電纜型號(hào)、種類(lèi)進(jìn)行分類(lèi),按照規(guī)定的施工順序進(jìn)行施工。同時(shí)加強(qiáng)對(duì)主要機(jī)械工具的檢查工作,在電纜敷設(shè)的過(guò)程中主要的施工機(jī)具包括:電纜滾筒盤(pán)、千斤頂,機(jī)械施工的集聚包括機(jī)械滑輪組、鋼絲吊鏈、鋼絲繩。測(cè)量工具包括:絕緣搖表、測(cè)量皮尺,施工包括:公用扳手、電氣焊、電工作業(yè)工具以及無(wú)線(xiàn)對(duì)講機(jī)等等,另外,現(xiàn)場(chǎng)的施工管理人員,還應(yīng)該對(duì)施工的機(jī)具進(jìn)行檢查與試驗(yàn),同時(shí)應(yīng)做好仔細(xì)的日常幾句保養(yǎng)以及點(diǎn)驗(yàn)工作,時(shí)刻保證所有機(jī)具狀態(tài)良好,符合施工標(biāo)準(zhǔn)。同時(shí)對(duì)施工材料進(jìn)行點(diǎn)驗(yàn)檢查,保證所有的施工材料滿(mǎn)足施工標(biāo)準(zhǔn),同時(shí)檢查組據(jù)的各種規(guī)格、型號(hào)、使用年限規(guī)定、出廠的詳細(xì)日期是否符合規(guī)定、電纜的承軸是否完好無(wú)損。同時(shí)對(duì)施工電纜進(jìn)行詳細(xì)的驗(yàn)收檢查:電纜外部絕緣皮是否完好無(wú)損、電纜的鎧裝是否存在銹跡瑕疵,是否存在著機(jī)械損傷,有無(wú)明顯的褶皺現(xiàn)象,是否存在著電纜線(xiàn)扭曲的現(xiàn)象,同時(shí)需要對(duì)高壓電纜進(jìn)行安裝前的絕緣試驗(yàn)。
2.2 實(shí)際施工時(shí)做好的控制
在進(jìn)行實(shí)際的電纜敷設(shè)施工前,必須對(duì)施工現(xiàn)場(chǎng)進(jìn)行絕緣試驗(yàn),只有當(dāng)試驗(yàn)指標(biāo)合格后才可進(jìn)行敷設(shè)施工。在施工時(shí)必須由專(zhuān)業(yè)的電纜敷設(shè)工程師帶隊(duì)指揮施工,并對(duì)鋪設(shè)電纜的根數(shù)、施工要求等進(jìn)行詳盡的規(guī)定,同時(shí)在現(xiàn)場(chǎng)的實(shí)際鋪設(shè)過(guò)程中,應(yīng)該根據(jù)先唱歌實(shí)際施工情況首先對(duì)集中地進(jìn)行鋪設(shè),然后對(duì)分散的進(jìn)行敷設(shè)。同時(shí)按照設(shè)計(jì)路徑的單根電纜長(zhǎng)度,合理的對(duì)每盤(pán)電纜進(jìn)行安排。同時(shí)對(duì)帶電區(qū)域進(jìn)行電纜敷設(shè)時(shí),必須保證應(yīng)有的安全措施。在敷設(shè)時(shí),每根電纜的放出與結(jié)束都必須嚴(yán)格的進(jìn)入到復(fù)核階段。同時(shí)保證每根電纜的敷設(shè)結(jié)束后都需專(zhuān)人對(duì)電纜的兩端進(jìn)行掛牌。掛牌上明確標(biāo)明電纜的型號(hào)、規(guī)格、回路編碼、終端配電箱的編號(hào)。同時(shí)在進(jìn)行電纜的終端與接頭時(shí)應(yīng)盡最大努力縮短絕緣暴露時(shí)間。在大霧、陰雨、雪天絕對(duì)不能對(duì)電纜頭及終端頭在室外進(jìn)行制作。同時(shí)保證終端頭內(nèi)保證不出現(xiàn)電氣聯(lián)通。為了防止?jié)駳庋亟拥鼐€(xiàn)進(jìn)入電纜內(nèi)部,外保護(hù)層必須用防水帶纏兩層,然后將接地線(xiàn)包夾在中間在估兩層。用電纜清潔紙仔細(xì)擦凈電纜上的絕緣層與銅導(dǎo)線(xiàn),然后使用鋸條、砂紙打磨鋼鎧和銅屏蔽,同時(shí)去掉上邊的防銹漆。對(duì)電纜的三叉口應(yīng)填充實(shí),并保證填充飽滿(mǎn)。其中的冷縮頭的填充必須保證使用電纜的油膏進(jìn)行填充。子還是記得鋪設(shè)電纜中,電纜需要從電纜盤(pán)的上方引出不應(yīng)該使得電纜在支架上端及地面的摩擦中摩擦順壞。電纜上不應(yīng)該出現(xiàn)鎧裝壓扁的現(xiàn)象,不能出現(xiàn)電纜產(chǎn)生絞擰的現(xiàn)象,護(hù)套的折裂等一系列未被消除的機(jī)械損傷,同時(shí)切實(shí)保證對(duì)電纜盤(pán)的固定牢靠穩(wěn)固,杜絕一切可能的安全事故的產(chǎn)生。同時(shí)電纜的在對(duì)電纜溝與隧道支架進(jìn)行敷設(shè)時(shí)必須提前安排好電纜在支架上的位置以及敷設(shè)次序。同時(shí)避免電纜的交叉穿越,保證留有伸縮的空間,同時(shí)需要注意的時(shí)在使用機(jī)械敷設(shè)電纜的過(guò)程中,速度必須≤每分鐘15米,在較復(fù)雜地段施工時(shí),速度還應(yīng)酌情減慢。在敷設(shè)的過(guò)程中,一旦發(fā)現(xiàn)電纜出現(xiàn)損壞與破損等情況應(yīng)及時(shí)處理。在電纜的鋪設(shè)過(guò)程中,在工期允許的條件下電纜的鋪設(shè)方式應(yīng)是高壓至低壓最后敷設(shè)控制與信號(hào)電纜,盡量避免不同電纜的交叉施工。
2.3驗(yàn)收控制
在施工結(jié)束提交驗(yàn)收前必須提交電纜線(xiàn)路協(xié)議文件,設(shè)計(jì)資料與圖紙、電纜清冊(cè)、在施工過(guò)程中的變更設(shè)計(jì)證明文件及竣工圖,制造廠家所提供的產(chǎn)品說(shuō)明書(shū)、實(shí)驗(yàn)報(bào)告、合格證書(shū)以及安裝圖紙等等技術(shù)文件,工程的技術(shù)記錄,電纜的型號(hào)、規(guī)格及實(shí)際敷設(shè)總長(zhǎng)度和分段長(zhǎng)度,電纜終端頭和中間接頭的型式及安裝日期,電纜終端頭和中間接頭中填充絕緣材料的名稱(chēng)和型號(hào),電纜交接試驗(yàn)記錄、終端頭和中間接頭試驗(yàn)記錄、相色記錄等資料和技術(shù)文件。驗(yàn)收規(guī)定中標(biāo)準(zhǔn)包括:電纜鋪設(shè)的排列整齊、表面無(wú)機(jī)械損傷、電纜兩端的標(biāo)志牌齊全、準(zhǔn)確、清楚。同時(shí)對(duì)電纜的彎曲半徑、電纜的固定問(wèn)題、相應(yīng)排列等等均符合標(biāo)準(zhǔn)規(guī)定接地線(xiàn)良好科學(xué),電纜終端相色正確,鋪設(shè)的金屬構(gòu)件支架防腐層完好、電纜溝及工井之內(nèi)沒(méi)有雜物存在隧道之中沒(méi)有雜物。通風(fēng)照明、排水等相應(yīng)設(shè)施符合設(shè)計(jì)規(guī)程,電纜的路徑標(biāo)志與實(shí)際的路徑相符合。路徑的標(biāo)識(shí)清晰牢固間距適中,且符合要求,施工質(zhì)量過(guò)關(guān),防火防漏電措施完備,在對(duì)電纜進(jìn)行檢查的時(shí)候,通常采用交接耐壓試驗(yàn)檢查。
3結(jié)語(yǔ)
對(duì)于保證電纜敷設(shè)的質(zhì)量問(wèn)題,建立起一整套健全、科學(xué)、嚴(yán)格、完善、合理的質(zhì)量管理體系是核心所在,對(duì)電纜鋪設(shè)的質(zhì)量管理工作應(yīng)該從始至終的貫穿整個(gè)工程的施工,在施工的過(guò)程中,應(yīng)嚴(yán)格的遵守施工條例與施工設(shè)計(jì)圖,在管理時(shí)制定科學(xué)詳盡的管理規(guī)章,從而保證各個(gè)施工依據(jù)施工,禁止任意性、隨意性的施工,同時(shí)保證建立起完善的管理崗位,為崗位配備專(zhuān)業(yè)的質(zhì)量檢查與相應(yīng)的管理人員,同時(shí)保證隨時(shí)可以按章辦事,保證依據(jù)相關(guān)的管理一度展開(kāi)工作管理,只有切實(shí)落實(shí)貫徹好這些理念,才能夠真正的確保整個(gè)工程的質(zhì)量。
參考文獻(xiàn):
[1]毛成校.電力工程中電纜敷設(shè)質(zhì)量管理的探討[J].建筑工程技術(shù)與設(shè)計(jì),2015,8(34):124-127.
[2]苗澤田,尹寶華.淺談電力工程中電纜敷設(shè)的質(zhì)量管理[J].城市建設(shè)理論研究:電子版, 2015,11(25):147-211.
[3]趙炳煥.對(duì)10kv電力電纜的敷設(shè)、安裝的施工質(zhì)量管理探討[J].科技風(fēng), 2014,11(11):12-15.
[4]苗澤田. 電力工程中電力電纜的敷設(shè)之我見(jiàn)[J].城市建設(shè)理論研究:電子版, 2015,9(21):21-27.
[5]辛永恒.淺談電力工程中電纜敷設(shè)的質(zhì)量管理[J].民營(yíng)科技,2010,12-20.
篇5
關(guān)鍵詞:電纜施工工藝流程注意要點(diǎn)
中圖分類(lèi)號(hào):TU74 文獻(xiàn)標(biāo)識(shí)碼:A 文章編號(hào):
隨著社會(huì)經(jīng)濟(jì)的不斷發(fā)展,城市街道的美化與供電架空線(xiàn)路的矛盾越來(lái)越突出,特別是10kV及以下配網(wǎng)線(xiàn)路。為了解決這一矛盾,近年來(lái)10kV及以下電纜線(xiàn)路開(kāi)始逐步替代10kV及以下架空線(xiàn)路。電纜線(xiàn)路相比架空線(xiàn)路有許多優(yōu)越性,特別是供電可靠性高。要保證電纜線(xiàn)路的供電可靠性高, 關(guān)鍵是要保證電纜的施工質(zhì)量。本文主要論述了10kV電纜施工中的注意要點(diǎn)。
1、10kV電纜施工工藝流程
電纜敷設(shè)必須嚴(yán)格按照《電氣裝置安裝工程電纜線(xiàn)路施工及驗(yàn)收規(guī)范》(G B50168-92)的要求施工。
工藝流程:準(zhǔn)備工作檢查預(yù)埋管揭電纜溝蓋板沿溝敷設(shè)電纜管口防水處理掛
標(biāo)示牌電纜測(cè)試驗(yàn)收送電。
2、施工前的準(zhǔn)備工作
2.1施工前的準(zhǔn)備工作主要是對(duì)設(shè)備、材料、成品和半成品進(jìn)場(chǎng)檢驗(yàn)結(jié)論應(yīng)有記錄,確認(rèn)符合規(guī)范規(guī)定,才能在施工中應(yīng)用。電線(xiàn)、電纜應(yīng)符合下列規(guī)定:按批查驗(yàn)合格證,合格證有生產(chǎn)許可證編號(hào),按《額定電壓450/750V及以下聚氯乙烯絕緣電纜》GB5023.1~5023.7標(biāo)準(zhǔn)生產(chǎn)的產(chǎn)品有安全認(rèn)證標(biāo)志。外觀檢查:包裝完好,抽檢的電線(xiàn)絕緣層完整無(wú)損,厚度均勻。電纜無(wú)壓扁、扭曲,鎧裝不松卷。耐熱、阻燃的電線(xiàn)、電纜外護(hù)層有明顯標(biāo)識(shí)和制造廠標(biāo);按制造標(biāo)準(zhǔn),現(xiàn)場(chǎng)抽樣檢測(cè)絕緣層厚度和圓形線(xiàn)芯的直徑;線(xiàn)芯直徑誤差不大于標(biāo)稱(chēng)直徑的1%
2.2型鋼和電焊條應(yīng)符合下列規(guī)定:按批查驗(yàn)合格證和材質(zhì)證明書(shū);有異議時(shí),按批抽樣送有資質(zhì)的試驗(yàn)室檢測(cè);外觀檢查:型鋼表面無(wú)嚴(yán)重銹蝕,無(wú)過(guò)度扭曲、彎折變形;電焊條包裝完整,拆包抽檢,焊條尾部無(wú)銹斑。
2.3鍍鋅制品(支架、橫擔(dān)、接地極、避雷用型鋼等)和外線(xiàn)金具應(yīng)符合下列規(guī)定:按批查驗(yàn)合格證或鍍鋅廠出具的鍍鋅質(zhì)量證明書(shū);外觀檢查:鍍鋅層覆蓋完整、表面無(wú)銹斑,金具配件齊全,無(wú)砂眼:對(duì)鍍鋅質(zhì)量有異議時(shí),按批抽樣送有資質(zhì)的試驗(yàn)室檢測(cè)。
2.4對(duì)于原有電纜走廊電纜工程,工作負(fù)責(zé)人必須派人根據(jù)有關(guān)電纜沿布圖,勘查全線(xiàn)電纜走廊是否通暢,對(duì)于舊走廊埋管,還必須預(yù)先帶一截電纜通管,確認(rèn)舊走廊埋管通暢。
2.5在住宅小區(qū)、內(nèi)街等地段施工,做好與物業(yè)管理公司,街道居委會(huì)聯(lián)系溝通取得支持,并貼公告告知廣大市民,防止突然停電給居民帶來(lái)不便。
3、10kV電纜施工中注意要點(diǎn)
3.1電纜的敷設(shè)
為保證電纜線(xiàn)路安裝的施工質(zhì)量,促使電纜線(xiàn)路施工技術(shù)水平的提高,確保電纜線(xiàn)路安全運(yùn)行,電纜安裝應(yīng)按如下要求進(jìn)行:
3.1.1電纜線(xiàn)路的安裝應(yīng)按已批準(zhǔn)的設(shè)計(jì)進(jìn)行施工。施工中的安全技術(shù)措施,應(yīng)符合現(xiàn)行有關(guān)安全技術(shù)標(biāo)準(zhǔn)及產(chǎn)品的技術(shù)文件規(guī)定,對(duì)重要的施工項(xiàng)目或工序,應(yīng)事先制定安全技術(shù)措施及嚴(yán)格按技術(shù)交底要求實(shí)施,電纜線(xiàn)路的施工及驗(yàn)收應(yīng)符合國(guó)家現(xiàn)行的有關(guān)標(biāo)準(zhǔn)規(guī)范的規(guī)定。
3.1.2電力電纜的搬運(yùn):把電纜裝車(chē)運(yùn)到施工現(xiàn)場(chǎng)前,應(yīng)檢查電纜盤(pán)本體是否牢固,各穿釘螺栓如有松動(dòng)應(yīng)緊牢。電纜的運(yùn)輸和裝卸應(yīng)由熟悉電纜性能和起重工作的人員擔(dān)任,并由一人統(tǒng)一指揮。禁止將電纜盤(pán)平放運(yùn)輸,以免壓傷電纜。裝運(yùn)電纜時(shí),應(yīng)用繩索綁牢,電纜盤(pán)前后打好腰栓,并應(yīng)用墊木墊好。行車(chē)時(shí)線(xiàn)盤(pán)前后不許站人,以免急剎車(chē)時(shí)傷人。電纜運(yùn)輸?shù)侥康牡睾?,不允許將電纜盤(pán)從車(chē)輛上直接推下,應(yīng)使用吊車(chē)或?qū)⑵溲刂鴪?jiān)固的跳板緩慢滾下。在松軟的地上滾動(dòng)電纜盤(pán)時(shí),可在路上墊以木板等物。滾動(dòng)電纜盤(pán)時(shí)應(yīng)按電纜盤(pán)上的箭頭方向滾動(dòng)。多人滾動(dòng)電纜盤(pán)時(shí),應(yīng)有專(zhuān)人指揮并防止傾倒或壓腳。
3.1.3電纜敷設(shè)前應(yīng)按下列要求進(jìn)行檢查:電纜通道暢通,排水良好,金屬部分的防腐層完整,隧道內(nèi)照明、通風(fēng)符合要求。電纜型號(hào)、電壓等級(jí)、規(guī)格應(yīng)符合設(shè)計(jì)要求。電纜外觀應(yīng)無(wú)損傷,絕緣良好,當(dāng)對(duì)電纜的密封有懷疑時(shí),應(yīng)進(jìn)行潮濕鑒定判斷,并應(yīng)試驗(yàn)合格。
3.1.4敷設(shè)前應(yīng)按設(shè)計(jì)和實(shí)際路徑計(jì)算每根電纜的長(zhǎng)度,合理安排電纜,減少電纜接頭,在帶電區(qū)域內(nèi)敷設(shè)電纜,應(yīng)有可靠的安全措施,并減少交叉跨越的位置。
3.1.5電力電纜敷設(shè):在放線(xiàn)前應(yīng)檢查所用的工具是否齊全可靠,不適合的工具寧可不用也不能湊合使用。檢查通訊工具能在良好的工作狀態(tài)。檢查敷設(shè)電纜線(xiàn)路的路徑是否暢通,有障礙物及時(shí)清理,以免工人經(jīng)過(guò)時(shí)摔倒。在敷設(shè)進(jìn)行中聽(tīng)從負(fù)責(zé)人統(tǒng)一指揮。敷設(shè)電纜前,應(yīng)將電纜盤(pán)穿在軸上,用千斤頂或?qū)S迷O(shè)備架牢固,使電纜盤(pán)轉(zhuǎn)動(dòng)時(shí)不致擺動(dòng)傾倒。檢查電纜盤(pán)是否完好,釘子、鐵絲等容易刺傷工作人員的東西應(yīng)全部拔除。電纜盤(pán)應(yīng)設(shè)專(zhuān)人看護(hù),放線(xiàn)人員應(yīng)由專(zhuān)人統(tǒng)一指揮,如遇問(wèn)題應(yīng)立即停止以便處理。電纜應(yīng)從盤(pán)的上端引出,不應(yīng)使電纜在支架上及地面摩擦拖拉,電纜上不得有鎧裝壓扁,電纜絞擰,護(hù)層撕裂等機(jī)械損傷。用滑車(chē)放電纜時(shí),不要在滑車(chē)轉(zhuǎn)動(dòng)時(shí)用手搬動(dòng)滑車(chē),施工人員應(yīng)站在滑車(chē)的下游方向。電纜穿孔或穿進(jìn)管子時(shí),施工人員握電纜的手的位置應(yīng)與孔口保持適當(dāng)距離。用機(jī)械敷設(shè)電纜時(shí),應(yīng)考慮繩索的機(jī)械強(qiáng)度,施工人員應(yīng)站在安全位置,精神集中,聽(tīng)從統(tǒng)一指揮,在交通繁華地段施工應(yīng)適當(dāng)增加聯(lián)系人員,電纜轉(zhuǎn)彎地段和穿管處應(yīng)設(shè)專(zhuān)人看管。在電纜夾層、隧道、人井中工作時(shí),應(yīng)有安全照明設(shè)備,以防撞傷,施工人員必須戴安全帽。在進(jìn)入前,必須驗(yàn)明確保無(wú)有毒氣體(檢查時(shí)用礦工安全燈觀察火焰,當(dāng)燈焰迅速減弱或熄滅,證明有不燃?xì)怏w且缺氧;當(dāng)燈焰爆燃后熄滅,即有煤氣、沼氣等可燃?xì)怏w;當(dāng)燈焰伸長(zhǎng)且呈藍(lán)色,證明有汽油氣體),當(dāng)發(fā)現(xiàn)存在有害氣體時(shí),應(yīng)先進(jìn)行通風(fēng),排除有害氣體后方能進(jìn)行工作。電力電纜在施工過(guò)程中,容易造成因電纜過(guò)度彎曲而導(dǎo)致的絕緣損壞。因此,為了保證電纜的絕緣良好及線(xiàn)芯、外皮等不受損傷,規(guī)程規(guī)定其彎曲半徑一般為電纜外徑的6-25倍,具體要求須根據(jù)廠家要求或地區(qū)標(biāo)準(zhǔn)。施放電纜時(shí)可用人工或機(jī)械操作或兩者兼用,人工施放必須每隔1.5米~2米放置滑輪一個(gè)。電纜端頭從線(xiàn)盤(pán)上取下放在滑輪上,然后用繩子扣住向前拖引。無(wú)論任何情況下,都不能把電纜直接放在地上拖引,以免擦傷電纜,影響施工質(zhì)量。用機(jī)械拖放電纜時(shí),應(yīng)緩慢前進(jìn),一般速度不應(yīng)超過(guò)8米/分,牽引頭必須加裝鋼絲套。電纜敷設(shè)就位完畢后,在纜體上 每隔10米緊纏一個(gè)電纜饋線(xiàn)標(biāo)稱(chēng)牌,復(fù)土后在電纜走廊上方標(biāo)釘“高壓電纜”的不銹鋼標(biāo)示牌。
3.2電纜頭的制作及固定
3.2.1電纜終端頭與接頭的制作,應(yīng)由經(jīng)過(guò)培訓(xùn)的熟悉工藝的人員進(jìn)行,并應(yīng)嚴(yán)格遵守制作工藝規(guī)程,應(yīng)附工藝手冊(cè)。在使用噴燈的工作現(xiàn)場(chǎng),必須放置手提式滅火器。
3.2.2制作電纜終端與接頭,從剝切電纜開(kāi)始應(yīng)連續(xù)操作直至完成,縮短絕緣暴露的時(shí)間。由于塑料絕緣電纜材料密實(shí)、硬度大,有時(shí)半導(dǎo)電屏蔽層與絕緣層粘附緊密,剝切困難,易損傷線(xiàn)芯和保留絕緣層的外表面,應(yīng)特別注意。
3.2.3電纜中間接頭的事故率在電纜故障中占較大比例,電纜中間接頭往往是在施工中沒(méi)有根據(jù)電纜長(zhǎng)度合理安排敷設(shè)造成的,故增加合理安排每盤(pán)電纜的要求。
3.2.4在雨天和路邊制作電纜接頭時(shí),應(yīng)做好防潮和防塵的遮蔽工作。接地線(xiàn)應(yīng)和電纜頭的金屬外殼相連,并應(yīng)與地網(wǎng)連接,戶(hù)外終端頭的地線(xiàn)應(yīng)與避雷器接地線(xiàn)連接;戶(hù)內(nèi)電纜頭裝設(shè)零序CT時(shí),戶(hù)內(nèi)頭應(yīng)對(duì)地絕緣,其接地線(xiàn)在穿過(guò)零序CT后再接地,以保證線(xiàn)路發(fā)生接地故障時(shí)發(fā)出正確的信號(hào)。電纜終端頭和接頭安裝完畢后,應(yīng)立即填寫(xiě)好“電纜終端(中間接)頭安裝記錄卡”。
3.2.5電力電纜在投入運(yùn)行后,必須考慮不致遭到各種損壞:如機(jī)械外力、震動(dòng)、摩擦、化學(xué)腐蝕、雜散電流和熱影響等。
3.2.6電纜頭的固定。需要根據(jù)現(xiàn)場(chǎng)電纜槽的尺寸焊接制作一個(gè)用10號(hào)槽鋼制作的專(zhuān)用電纜固定支架,槽鋼的兩端各焊接一塊約25cm*15cm*0.4cm的鋼板用于固定槽鋼,鋼板四角分別鉆四個(gè)φ1.2cm的孔,用M12*8cm的拉爆螺栓固定在電纜槽兩側(cè)的槽壁上。另外需用一根角鐵將槽鋼與電纜槽的后側(cè)壁相連,以加強(qiáng)槽鋼的穩(wěn)固性,角鐵與槽壁的固定采用焊接一塊約25cm*15cm的鋼板、鋼板上按對(duì)角鉆二個(gè)φ1.2cm的孔,用M12*6的拉爆螺栓固定的方法固定。如需裝設(shè)零序電流互感器時(shí),槽鋼下方還需用6*6cm的角鐵焊接一個(gè)用于裝載零序電流互感器的架子。嚴(yán)禁將電纜直接固定在電纜槽的槽壁上。槽鋼的水平安裝位置應(yīng)比高壓柜蓋板的水平位置低約10cm,零序電流互感器的水平安裝位置應(yīng)比槽鋼的水平安裝位置低約5~10cm。電纜固定在槽鋼上時(shí),需用抱箍,抱箍與電纜接觸的部位需加上固定電纜用的專(zhuān)用膠墊,不能用電纜皮。
3.3施工中注意問(wèn)題
3.3.1結(jié)合設(shè)計(jì)圖察勘現(xiàn)場(chǎng),摸清工程實(shí)地情況、工地運(yùn)輸?shù)缆?、鄰近建筑、地下管線(xiàn)、障礙物,將電纜敷設(shè)線(xiàn)路定位劃線(xiàn),確定電纜(線(xiàn))敷設(shè)路徑、規(guī)格及環(huán)境狀況。
3.3.2直埋電纜鋪砂蓋板或磚時(shí)應(yīng)防止不清除溝內(nèi)雜物、不用細(xì)砂或細(xì)土、蓋板或磚不嚴(yán)有遺漏部分。電纜溝的轉(zhuǎn)角處需挖成圓弧形,溝底應(yīng)鋪一層100mm厚的細(xì)砂,電纜敷設(shè)后亦應(yīng)鋪不小于100mm厚的細(xì)砂或軟土,并蓋混凝土保護(hù)板。
3.3.3施工負(fù)責(zé)人應(yīng)加強(qiáng)檢查。油浸電纜要防止兩端頭封鉛不嚴(yán)密、有滲油現(xiàn)象。應(yīng)對(duì)施工操作人員進(jìn)行技術(shù)培訓(xùn),提高操作水平。沿支架或橋架敷設(shè)電纜時(shí),應(yīng)防止電纜排列不整齊,交叉嚴(yán)重。
3.3.4電纜施工前須將電纜事先排列好,劃出排列圖表,按圖表進(jìn)行施工。電纜敷設(shè)時(shí),應(yīng)敷設(shè)一根整理一根,卡固一根。有麻皮保護(hù)層的電纜進(jìn)入室內(nèi),防止不作剝麻刷油防腐處理。沿橋架或托盤(pán)敷設(shè)的電纜應(yīng)防止彎曲半徑不夠。在橋架或托盤(pán)施工時(shí),施工人員應(yīng)考慮滿(mǎn)足該橋架或托盤(pán)上敷設(shè)的最大截面電纜的彎曲半徑的要求。防止電纜標(biāo)志牌掛裝不整齊,或有遺漏。應(yīng)由專(zhuān)人復(fù)查。
參考文獻(xiàn)
篇6
關(guān)鍵詞城軌交通 供電系統(tǒng) 送電工作籌劃 送電工作組織
中圖分類(lèi)號(hào):U223文獻(xiàn)標(biāo)識(shí)碼: A
1 供電系統(tǒng)首次送電概述
地鐵供電系統(tǒng)是軌道交通工程重要的組成部分,為各系統(tǒng)設(shè)備調(diào)試、運(yùn)行提供了最直接的電力供應(yīng)?!半娡ā笔浅擒壾壍澜煌üこ探ㄔO(shè)中具有里程碑意義的重要環(huán)節(jié),地鐵新線(xiàn)建設(shè)工程供電系統(tǒng)送電組織管理工作的好壞,直接關(guān)系到其它系統(tǒng)、車(chē)站設(shè)備調(diào)試工作的開(kāi)展和開(kāi)通目標(biāo)的實(shí)現(xiàn)。由于送電工作涉及面大、影響廣、任務(wù)重,供電系統(tǒng)首次送電工作必須做好送電工作的整體策劃,并在組織送電過(guò)程中落實(shí)好各項(xiàng)計(jì)劃申報(bào)、安全措施、送電程序等各項(xiàng)工作,以保證地鐵新線(xiàn)建設(shè)工程階段送電工作安全、順利、有序的進(jìn)行。
2 供電系統(tǒng)組成
目前國(guó)內(nèi)城軌交通供電方式主要分為集中供電、分散供電、混合供電三種。本文主要論述集中供電方式的城軌交通工程送電工作。城市軌道交通集中供電系統(tǒng)主要由外部電源、主變電站、牽引供電系統(tǒng)、動(dòng)力照明供電系統(tǒng)、接觸網(wǎng)(軌)、雜散電流防護(hù)系統(tǒng)、接地系統(tǒng)等部分組成,其典型主接線(xiàn)圖見(jiàn)圖1。
圖1 城市軌道交通集中供電系統(tǒng)典型接線(xiàn)圖
主變電站:從城市電力系統(tǒng)變電站引入兩路110kV高壓交流電源,并在主變電站內(nèi)通過(guò)主變壓器降壓為軌道交通供電系統(tǒng)使用的33kV交流電,再通過(guò)供電系統(tǒng)網(wǎng)絡(luò)將電能分配到每一個(gè)車(chē)站和車(chē)輛段內(nèi)的牽引變電所和降壓變電所。
牽引降壓供電系統(tǒng):對(duì)主變電站引來(lái)的兩路33kV交流電通過(guò)設(shè)置在車(chē)站(或車(chē)輛段)變電所內(nèi)的牽引變壓器進(jìn)行降壓整流變?yōu)?500V直流電,再通過(guò)供電系統(tǒng)1500V母排向各直流開(kāi)關(guān)柜供電。
低壓配電系統(tǒng):對(duì)將兩路33kV交流電通過(guò)動(dòng)力變壓器降壓成380/220V交流電,向車(chē)站和區(qū)間隧道的各種動(dòng)力、照明設(shè)備、交直流屏供電,保證各種車(chē)站設(shè)備的正常運(yùn)行。
接觸網(wǎng)(軌):對(duì)直流開(kāi)關(guān)柜引來(lái)的1500V直流電通過(guò)沿線(xiàn)架設(shè)的接觸網(wǎng)(軌)不間斷地供給運(yùn)行中的電動(dòng)列車(chē),以保證電動(dòng)列車(chē)正常運(yùn)行。
3 送電工作籌劃
3.1送電流程總體策劃
依據(jù)軌道交通供電系統(tǒng)組成及工程管理特點(diǎn),一般送電流程須先后進(jìn)行主變電站送電、牽引供電系統(tǒng)送電、接觸網(wǎng)(軌)送電、低壓設(shè)備送電等4個(gè)重大環(huán)節(jié),總體送電流程見(jiàn)圖2。部分城軌工程供電中壓環(huán)網(wǎng)電壓為36KV、接觸網(wǎng)(軌)電壓為750V,與圖2稍有不同,但送電流程基本一致。各環(huán)節(jié)的送電范圍劃分如下:
主變電站送電:110KV電力電纜、110KV GIS、110KV/33KV變壓器、33KV高壓開(kāi)關(guān)柜、動(dòng)力變壓器、電抗器、交直流電源裝置、33KV電纜及33KV饋出電纜至地鐵牽引及降壓變電所進(jìn)線(xiàn)電纜頭。
牽引降壓供電系統(tǒng)送電:33KV電纜、33KV高壓開(kāi)關(guān)柜、整流機(jī)組、直流1500V開(kāi)關(guān)柜、1500V直流電力電纜、動(dòng)力變壓器、400V開(kāi)關(guān)柜、所內(nèi)用電系統(tǒng)等供電設(shè)備。
接觸網(wǎng)(軌)送電:由1500V直流開(kāi)關(guān)柜直接向接觸(網(wǎng))軌送電。
車(chē)站低壓配電系統(tǒng)送電:由400V低壓開(kāi)關(guān)柜向各系統(tǒng)用電設(shè)備送電。
圖2 城市軌道交通供電系統(tǒng)總體送電流程圖
3.2 成立送電組織機(jī)構(gòu)
成立送電工作組織機(jī)構(gòu)是送電準(zhǔn)備工作的關(guān)鍵環(huán)節(jié)。軌道交通供電系統(tǒng)首次送電時(shí)仍處于工程建設(shè)期,此階段送電工作相關(guān)責(zé)任單位包括業(yè)主單位(含建設(shè)、運(yùn)營(yíng)單位)、施工單位、監(jiān)理單位、供電設(shè)備供貨商、其他系統(tǒng)設(shè)備供貨商。結(jié)合送電范圍、程序在組織機(jī)構(gòu)上可成立送電工作組,下設(shè)若干送電小組,如送電區(qū)域與既有運(yùn)營(yíng)線(xiàn)路有接口應(yīng)成立運(yùn)營(yíng)送電小組(詳見(jiàn)圖3)。
圖3 送電工作組織機(jī)構(gòu)圖
3.3 制定相關(guān)制度、協(xié)議
送電工作相關(guān)工作制度、協(xié)議主要包括以下3項(xiàng):
(1)送電管理辦法
送電管理辦法是指導(dǎo)送電工作有序開(kāi)展的綱領(lǐng)性文件,明確確了各層級(jí)送電組織機(jī)構(gòu)及職責(zé)、送電技術(shù)管理、送電安全管理、用電費(fèi)用等關(guān)鍵內(nèi)容,是其他送電管理規(guī)章制度、送電實(shí)施方案的編制依據(jù)。此辦法需由送電工作組牽頭組織編制。
(2)“臨管”階段電力調(diào)度管理辦法
“臨管”階段是指供電系統(tǒng)首次送電后至移交運(yùn)營(yíng)前的時(shí)期,是軌道交通供電系統(tǒng)由建設(shè)轉(zhuǎn)入運(yùn)營(yíng)的過(guò)渡期。供電系統(tǒng)設(shè)備受電后的電力調(diào)度管理、系統(tǒng)設(shè)備運(yùn)行管理、施工安全管理等均需由《“臨管”階段電力調(diào)度管理辦法》進(jìn)行規(guī)范,此辦法由主變點(diǎn)站送電工作小組、送電工作組共同編制。
(3)簽訂相關(guān)協(xié)議
主變電站送電前,城軌單位應(yīng)與當(dāng)?shù)毓╇娋趾炗喺{(diào)度協(xié)議和用電協(xié)議,明確調(diào)度管理接口、職責(zé)及用電費(fèi)用等事宜,如部分供電系統(tǒng)設(shè)備(如主變電站)先行移交運(yùn)營(yíng)單位管理,運(yùn)營(yíng)單位與承包商還需就電力調(diào)度接口簽訂調(diào)度協(xié)議,如涉及與各施工單位用電費(fèi)用結(jié)算還需簽訂電費(fèi)協(xié)議。
3.4 送電方案
送電方案是送電相關(guān)工作的具體實(shí)施方案,整個(gè)送電過(guò)程將嚴(yán)格按照送電方案進(jìn)行操作,方案內(nèi)容需明確送電范圍、前提條件、人員安排、送電程序、安全措施、送電操作卡等關(guān)鍵內(nèi)容。各送電小組須提前編制送電方案,交付送電工作組審核后實(shí)施。
4 送電工作組織
4.1 確認(rèn)受電前提條件
送電區(qū)域必須具備相應(yīng)前提條件才能送電,送電前送電工作組應(yīng)組織相應(yīng)送電小組進(jìn)行送電前檢查。檢點(diǎn)內(nèi)容至少包括:
(1)送電前,所有安裝,調(diào)試工作均已完成并通過(guò)預(yù)驗(yàn)、初驗(yàn),且整改項(xiàng)目已完成,引進(jìn)設(shè)備安裝、調(diào)試驗(yàn)收?qǐng)?bào)告已簽發(fā),確認(rèn)高壓耐壓試驗(yàn)不應(yīng)超過(guò)三個(gè)月,否則,應(yīng)重試。
(2)所內(nèi)和電纜通道清潔、無(wú)雜物,孔洞封堵完成,電纜夾層不積水。
(3)送、受電相關(guān)區(qū)域通信聯(lián)絡(luò)暢通,固定電話(huà)、對(duì)講機(jī)配置到位,并已有完備的聯(lián)系電話(huà)表。
(4)承包商送電通知已發(fā)至相關(guān)車(chē)站、系統(tǒng),且已在車(chē)站、區(qū)間醒目處張貼送電通告。
(5)所有將正式送電的設(shè)備已與臨時(shí)施工用電分開(kāi),有明顯的斷開(kāi)點(diǎn)、且已做好安全防護(hù)措施,送電時(shí),所有的設(shè)備和電纜均有明顯的帶電標(biāo)志牌。
4.2 落實(shí)送電安全措施
安全措施的落實(shí)對(duì)于送電工作的開(kāi)展至關(guān)重要,所有參與送電工作單位均有落實(shí)安全措施的責(zé)任,送電過(guò)程相關(guān)安全措施應(yīng)包括以下內(nèi)容:
(1)送電前,由承包商發(fā)通知給相關(guān)施工單位,一經(jīng)送電即作為有電設(shè)備,進(jìn)入送電區(qū)域內(nèi)作業(yè),須按規(guī)定辦理許可作業(yè)手續(xù)。
(3)參加送電的人員必須嚴(yán)格遵守供電系統(tǒng)安全規(guī)定,嚴(yán)禁非操作人員操作或違章操作。參加送電的各單位對(duì)本單位的設(shè)備、人身安全負(fù)責(zé),明確職責(zé),落實(shí)到人。
(4)與送電相關(guān)的所外設(shè)備(電纜等)附近2米內(nèi)禁止人員走動(dòng)、站立及觸摸。接觸網(wǎng)送電時(shí),除工作人員外,嚴(yán)禁任何人在送電區(qū)域內(nèi)網(wǎng)下走動(dòng),各車(chē)站施工人員嚴(yán)禁在接觸導(dǎo)線(xiàn)附近高舉長(zhǎng)大物件或觸撞接觸網(wǎng)設(shè)備。接觸網(wǎng)停電后需組織驗(yàn)電確認(rèn)無(wú)電才能離開(kāi)。
(5)驗(yàn)電人員必須穿絕緣靴,戴絕緣手套,其中一名負(fù)責(zé)驗(yàn)電,另一名監(jiān)護(hù),按調(diào)度命令執(zhí)行驗(yàn)電操作。
(6)受電前設(shè)備開(kāi)關(guān)位置處于安全位置。
4.3 執(zhí)行送電程序
送電程序應(yīng)嚴(yán)格按照送電方案中提前制定的操作卡執(zhí)行,每個(gè)操作步驟必須執(zhí)行一人操作、一人監(jiān)視制度;每個(gè)送電步驟實(shí)施后須觀察設(shè)備狀態(tài)和運(yùn)行情況,確認(rèn)正常后方可進(jìn)行下一步的操作。每個(gè)送電步驟均包括若操作步驟,以某城軌單位牽引降壓所33KV饋線(xiàn)柜向動(dòng)力變壓器送電為例,其送電操作步驟如下:
(1)合1041A隔開(kāi)刀閘;
(2)合104A開(kāi)關(guān),1#動(dòng)力變第一次受電(觀察5分鐘);
(3)分104A開(kāi)關(guān);
(4)合104A開(kāi)關(guān),1#動(dòng)力變第二次受電(觀察運(yùn)行是否正常);
(5)模擬動(dòng)力變繞組溫度保護(hù)跳開(kāi)104開(kāi)關(guān);
(6)合104A開(kāi)關(guān),1#動(dòng)力變第三次受電(觀察運(yùn)行是否正常)。
4.4 安排受電后的檢查、值班
送電后,送電小組成員應(yīng)組織相關(guān)人員進(jìn)行設(shè)備巡視、檢查,原則上每2小時(shí)巡視一次,如變壓器、電纜、開(kāi)關(guān)柜等。(主)變電所送電試運(yùn)行24小時(shí)視為送電成功,后續(xù)由值班人員連續(xù)不間斷在所內(nèi)值守。接觸網(wǎng)(軌)送電后,即時(shí)組織人員到達(dá)對(duì)應(yīng)供電臂進(jìn)行驗(yàn)電,帶電24小時(shí)后視為送電成功并申請(qǐng)停電,停電過(guò)程驗(yàn)電確認(rèn)無(wú)電后方可離場(chǎng)。低壓用電設(shè)備受電后須,由用電專(zhuān)業(yè)供貨商、承包商確認(rèn)受電正常并交付使用。
5 結(jié)語(yǔ)
城市軌道交通供電系統(tǒng)首次送電工作成功并投入試運(yùn)行,標(biāo)志著地鐵工程進(jìn)入了電通后的區(qū)間列車(chē)及機(jī)電系統(tǒng)設(shè)備調(diào)試階段,對(duì)新線(xiàn)工程的按期順利開(kāi)通啟動(dòng)決定性的作用。目前國(guó)內(nèi)地鐵行業(yè)正處于新線(xiàn)建設(shè)的,尤其許多城市正在建設(shè)第一條線(xiàn)路,供電系統(tǒng)首次送電籌劃應(yīng)結(jié)合新線(xiàn)工程工期總策劃進(jìn)行統(tǒng)籌考慮,并。本文所探討的建設(shè)期供電系統(tǒng)送電籌劃與組織經(jīng)驗(yàn)是筆者在總結(jié)北京、廣州等城市地鐵經(jīng)驗(yàn)的基礎(chǔ)上提出的,對(duì)于新開(kāi)地鐵城市具有指導(dǎo)及借鑒意義。
參考文獻(xiàn)
篇7
關(guān)鍵詞:建筑電氣 安裝方法 質(zhì)量控制
隨著經(jīng)濟(jì)的發(fā)展,現(xiàn)代建筑內(nèi)部辦公專(zhuān)業(yè)設(shè)施齊全。為了保證現(xiàn)代建筑電氣整體運(yùn)行的可靠性,電氣工程中的電氣安裝方法和安裝工作及其質(zhì)量控制至關(guān)重要。所以,我們?cè)谡麄€(gè)工程建設(shè)工程電氣施工過(guò)程中要抓住以下幾個(gè)關(guān)鍵環(huán)節(jié)的控制,使整個(gè)工程的電氣系統(tǒng)安裝達(dá)到優(yōu)質(zhì)工程標(biāo)準(zhǔn)。
一?施工準(zhǔn)備
(1)圖紙會(huì)審
圖紙會(huì)審對(duì)保證建筑電氣施工質(zhì)量至關(guān)重要。圖紙會(huì)審就是要把在熟悉圖紙過(guò)程中發(fā)現(xiàn)的問(wèn)題,盡可能地消滅在工程開(kāi)工前,減少施工圖中的差錯(cuò),完善設(shè)計(jì),提高建筑電氣工程質(zhì)量。
建筑電氣施工圖圖紙會(huì)審的重點(diǎn)。對(duì)于建筑電氣專(zhuān)業(yè)一般情況應(yīng)從以下幾個(gè)方面進(jìn)行圖紙會(huì)審。A1電氣專(zhuān)業(yè)圖紙及說(shuō)明是否齊全,電氣施工圖的平面圖與土建圖及其他專(zhuān)業(yè)的平面圖是否相符;B1設(shè)計(jì)圖紙的設(shè)計(jì)內(nèi)容是否符合設(shè)計(jì)規(guī)范和施工驗(yàn)收規(guī)范的規(guī)定,是否完善了安全用電的措施,在施工技術(shù)上有無(wú)困難;C1電器設(shè)備位置尺寸正確與否,軸線(xiàn)位置與設(shè)備間的尺寸有無(wú)差錯(cuò),設(shè)備與建筑結(jié)構(gòu)是否一致,安裝設(shè)備處是否進(jìn)行了結(jié)構(gòu)處理。D1電氣施工圖與建筑結(jié)構(gòu)及其他專(zhuān)業(yè)安裝之間有無(wú)矛盾,應(yīng)采取哪些安全措施,配合施工時(shí)存在哪些技術(shù)問(wèn)題和解決措施。E1管路布置方式及管線(xiàn)是否與地面、樓層及墊層厚度相符,配電系統(tǒng)圖與平面圖之間的導(dǎo)線(xiàn)根數(shù)、管徑的標(biāo)注是否正確。
(2)施工方案編制與審批
施工方案是以單位工程中的分部或分項(xiàng)工程或一個(gè)專(zhuān)業(yè)工程為編制對(duì)象、內(nèi)容比施工組織設(shè)計(jì)更為具體而簡(jiǎn)明扼要。它主要是根據(jù)工程特點(diǎn)和具體要求對(duì)施工中的主要工序和保證工程質(zhì)量及安全技術(shù)措施、施工方法、工序配合等方面進(jìn)行合理的安排布置。(1)施工方案的編制。施工方案的內(nèi)容較施工組織簡(jiǎn)明扼要,建筑電氣安裝是建筑安裝工程的分項(xiàng)工程,通常情況下建筑電氣工程均由施工單位的電氣工程技術(shù)人員編制施工方案。(2)施工方案的審批。施工方案的審查,均先由施工單位進(jìn)行審批,再由總監(jiān)理工程師組織專(zhuān)業(yè)監(jiān)理工程師進(jìn)行,提出審查意見(jiàn),并經(jīng)總監(jiān)理工程師審核,簽認(rèn)后報(bào)建設(shè)單位。需施工單位修改的,由總監(jiān)理工程師簽發(fā)書(shū)面意見(jiàn),退回施工單位修改后再報(bào)審,并重新審定。
二?施工方法
(1)配電設(shè)備安裝
(1)配電箱安裝。配電箱是接受電能和分配電能的中轉(zhuǎn)站,也是電力負(fù)荷的現(xiàn)場(chǎng)直接控制器。電氣設(shè)備的上下級(jí)容量配合是相當(dāng)嚴(yán)格的,若不符合技術(shù)要求,勢(shì)必造成系統(tǒng)運(yùn)行不合理、供電可靠性及安全性達(dá)不到要求,埋下事故的隱患。(2)弱電設(shè)備安裝建筑物內(nèi)弱電設(shè)備多,專(zhuān)業(yè)性強(qiáng),每個(gè)弱電子系統(tǒng)均有專(zhuān)門(mén)的技術(shù)人員安裝調(diào)試,監(jiān)理工程師一般對(duì)諸多智能系統(tǒng)不可能都精通,應(yīng)抓好線(xiàn)管、線(xiàn)槽施工質(zhì)量的同時(shí),著重對(duì)系統(tǒng)設(shè)備的功能進(jìn)行控制。管理人員若不按合同控制,就會(huì)使工程少測(cè)控點(diǎn)、缺功能。
(2)配線(xiàn)工程
配線(xiàn)工程是建筑電氣工程中的重要組成部分,其工程質(zhì)量的好壞直接影響整個(gè)建筑物的安全和壽命。施工中要采用合理的施工方法,制定有效的技術(shù)措施,按設(shè)計(jì)及施工驗(yàn)收規(guī)范的要求,做好配線(xiàn)工程施工質(zhì)量的事前、事中控制,嚴(yán)格把關(guān),認(rèn)真做好技術(shù)復(fù)核,對(duì)不符合規(guī)范或標(biāo)準(zhǔn)要求之處,提請(qǐng)?jiān)O(shè)計(jì)人員提出處理方案,對(duì)不符合工藝要求之處及時(shí)糾正保證按施工方案施工。
(1)導(dǎo)線(xiàn)的安全要求。導(dǎo)線(xiàn)的安全要求包括導(dǎo)線(xiàn)的電壓等級(jí)、導(dǎo)線(xiàn)的截面要求、導(dǎo)線(xiàn)的絕緣和分色要求,這些必須按國(guó)家現(xiàn)行的規(guī)程、規(guī)范嚴(yán)格執(zhí)行。
(2)電力電纜。電纜是輸送電能的載體,若質(zhì)量不高,就會(huì)造成火災(zāi)等事故的頻繁發(fā)生。如工程中電纜型號(hào)有GNHYJE22、GNHYJE、GNHYJV22、GNHYJV、GZRUJV ZRYJV等,施工單位在布放強(qiáng)電豎井的電纜時(shí),如果將GNHYJE型電纜換成了GZRYJV型電纜,降低了防火標(biāo)準(zhǔn)和使用性能,將為以后的使用埋下了很大的隱患。
三?電氣工程調(diào)試
電氣工程調(diào)試是鑒定供配電系統(tǒng)設(shè)計(jì)質(zhì)量、安裝質(zhì)量及設(shè)備材料質(zhì)量的重要手段,是檢驗(yàn)電氣線(xiàn)路正確性及電氣設(shè)備性能能否達(dá)到設(shè)計(jì)控制保護(hù)要求的重要工序,是設(shè)備能否正常運(yùn)行和運(yùn)行過(guò)程中可靠性、安全性的關(guān)鍵。所以,必須加強(qiáng)系統(tǒng)調(diào)試組織和計(jì)劃工作,為工程順利竣工提供保障。
(1)單元件試驗(yàn)。單元件調(diào)試主要包括盤(pán)柜內(nèi)各電器元件的試驗(yàn)、校核,及二項(xiàng)回路的絕緣檢查,配電裝置主開(kāi)關(guān)的絕緣測(cè)試和操作試驗(yàn),電力電纜、密集封閉母線(xiàn)槽的回路復(fù)核及耐壓、絕緣測(cè)試,電力監(jiān)控系統(tǒng)的回路測(cè)試,接地系統(tǒng)測(cè)試。
(2)分部、分系統(tǒng)調(diào)試。本階段主要是對(duì)已完成調(diào)校的分系統(tǒng)、分部進(jìn)行模擬試驗(yàn),以確保其動(dòng)作達(dá)到設(shè)計(jì)及生產(chǎn)要求,包括項(xiàng)目有:各盤(pán)柜、電源箱的二次回路模擬動(dòng)作試驗(yàn);配合電力監(jiān)控系統(tǒng)進(jìn)行供配電系統(tǒng)的監(jiān)測(cè)和控制調(diào)校。
(3)電氣系統(tǒng)通電及聯(lián)合調(diào)試。本階段調(diào)試主要工作為:(1)根據(jù)設(shè)計(jì)要求對(duì)供配電系統(tǒng)按照先主回路后支回路的順序依次送電。(2)高、低壓室主開(kāi)關(guān)及母聯(lián)開(kāi)關(guān)試驗(yàn):先采用正常工作電壓供電,各主開(kāi)關(guān)、母聯(lián)開(kāi)關(guān)應(yīng)能正確通斷,動(dòng)作正常;接著用調(diào)壓器降壓進(jìn)行失壓試驗(yàn),各開(kāi)關(guān)應(yīng)能正確分?jǐn)唷#?)高、低壓主開(kāi)關(guān)失壓互投試驗(yàn):先采用正常工作電壓供電,接著用調(diào)壓器進(jìn)行降壓,根據(jù)電力監(jiān)控系統(tǒng)的設(shè)計(jì)要求,配合電力監(jiān)控系統(tǒng)供貨商進(jìn)行供配電系統(tǒng)的狀態(tài)監(jiān)測(cè)和控制調(diào)試。
四?質(zhì)量控制方法
4.1?實(shí)現(xiàn)質(zhì)量目標(biāo)的預(yù)控。既然質(zhì)量目標(biāo)是優(yōu)質(zhì)工程,那么如何具體來(lái)實(shí)現(xiàn)呢?作為施工方管理人員,首先,必須分清工程中的重點(diǎn)環(huán)節(jié),凡事有預(yù)則明,有明則清。所以,在控制中,一定要根據(jù)合同仔細(xì)推敲,嚴(yán)格管理,實(shí)現(xiàn)系統(tǒng)應(yīng)具備的功能,成為分項(xiàng)的優(yōu)質(zhì)工程。
篇8
關(guān)鍵詞:城市電網(wǎng);運(yùn)行;安全管理;技術(shù)升級(jí);技術(shù)要點(diǎn)
中圖分類(lèi)號(hào):F407 文獻(xiàn)標(biāo)識(shí)碼:A
隨著我國(guó)經(jīng)濟(jì)和社會(huì)的迅猛發(fā)展,城市對(duì)各種資源“虹吸”效應(yīng)日趨明顯,電能是主要的生產(chǎn)和消費(fèi)能源,是當(dāng)今城市主要消耗的能源詳實(shí),在今后一段比較長(zhǎng)的時(shí)間里城市中企業(yè)生產(chǎn)、居民生活和市政建設(shè)都離不開(kāi)電能的有效供應(yīng),這樣的情況下,對(duì)城市電網(wǎng)負(fù)荷量和供電容量的要求有了比較大的提高,同時(shí),城市電網(wǎng)的供電可靠性也被賦予了更高的意義和價(jià)值,因此需要采取各種有效的措施,提升城市電網(wǎng)運(yùn)行的安全性,確保城市電網(wǎng)的供電質(zhì)量和供電效率。城市電力工作者應(yīng)該依據(jù)城市電網(wǎng)實(shí)際的安裝、維護(hù)和管理的實(shí)際工作,加強(qiáng)對(duì)城市電網(wǎng)在安裝、維護(hù)和管理過(guò)程中出現(xiàn)各種安全上隱患的了解,根據(jù)城市電網(wǎng)安全管理的實(shí)際情況,提出提高城市電網(wǎng)運(yùn)行安全管理水平的技術(shù)要點(diǎn),達(dá)到提高城市電網(wǎng)運(yùn)行安全管理水平有參考和借鑒的效果,真正實(shí)現(xiàn)城市電網(wǎng)運(yùn)行安全管理水平的提高,確保城市電網(wǎng)安全運(yùn)行的水平。
1.城市電網(wǎng)施工和運(yùn)行過(guò)程中的安全隱患
在城市現(xiàn)代化建設(shè)中,由于空間資源的限制城市電網(wǎng),特別是高電壓等級(jí)架空線(xiàn)路經(jīng)常出現(xiàn)占地面積過(guò)大、安全距離不足和架空裸線(xiàn)線(xiàn)路等問(wèn)題,這常常埋下城市電網(wǎng)的安全隱患,在特定的情況下會(huì)導(dǎo)致安全事故,影響城市電網(wǎng)正常的功能和作用。城市電網(wǎng)電纜線(xiàn)路本體出現(xiàn)瓦礫、建筑垃圾和工業(yè)酸堿性排泄物,這樣的情況會(huì)導(dǎo)致電纜出現(xiàn)腐蝕,影響電網(wǎng)的供電效果,嚴(yán)重會(huì)引起重大的安全事故。城市電網(wǎng)施工中由于技術(shù)控制不嚴(yán)格和人為等因素經(jīng)常會(huì)出現(xiàn)挖斷、拉裂拉傷等故障發(fā)生。城市電網(wǎng)施工中沒(méi)有對(duì)電纜線(xiàn)路外露部位應(yīng)采取相關(guān)保護(hù)措施,導(dǎo)致城市電網(wǎng)電纜出現(xiàn)破壞事故和腐蝕現(xiàn)象。城市電網(wǎng)電纜終端頭、引出線(xiàn)、接點(diǎn)部位由于破損、污穢物產(chǎn)生發(fā)熱和燒損等現(xiàn)象,埋下安全隱患。城市電網(wǎng)電力設(shè)備出現(xiàn)破損、殘缺等問(wèn)題,導(dǎo)致安全事故。
2.電網(wǎng)中電纜運(yùn)行維護(hù)的要點(diǎn)分析
2.1 電纜本體運(yùn)行維護(hù)技術(shù)
電網(wǎng)是電力發(fā)展的重要支柱,在對(duì)電網(wǎng)進(jìn)行維護(hù)的時(shí)候,我們的維護(hù)人員首先要做的就是觀察電纜線(xiàn)路,看一看線(xiàn)路的本體上是不是有建筑垃圾、廢棄材料等廢棄物。除了表面上看到的問(wèn)題,一些特殊部位出現(xiàn)問(wèn)題也要及時(shí)地進(jìn)行解決,像穿過(guò)橋梁這一部分的電纜,我們的維護(hù)人員就要看橋墩兩端的電纜是不是處于拉緊的狀態(tài),而對(duì)于穿過(guò)公路等部位的電纜線(xiàn)路,我們還要查看有沒(méi)有施工挖掘之后留下的痕跡。除此之外我們的維護(hù)人員還要檢查城市電網(wǎng)電纜敷設(shè)的周?chē)袥](méi)有挖掘等施工作業(yè)的現(xiàn)象,合理規(guī)劃電纜安裝路線(xiàn),進(jìn)一步避免電纜線(xiàn)路破壞事故的發(fā)生。
2.2 電纜終端運(yùn)行維護(hù)技術(shù)
城市電網(wǎng)在實(shí)際的運(yùn)行維護(hù)中,我們的維護(hù)人員要及時(shí)檢查一下電纜終端的接頭連接處是否緊密,引出線(xiàn)的節(jié)點(diǎn)部位有沒(méi)有發(fā)熱或者是損壞的情況。
2.3 電力管溝運(yùn)行維護(hù)技術(shù)
對(duì)于那些敷設(shè)在房屋內(nèi)部的電力溝內(nèi)的電纜,我們的維護(hù)人員要及時(shí)地檢查消防防火設(shè)施是不是科學(xué)合理的,此外還要檢查電纜溝溝道蓋板是不是有破損的現(xiàn)象。過(guò)路保護(hù)管道是不是通暢的等等。
3.提高城市電網(wǎng)運(yùn)行安全管理的技術(shù)要點(diǎn)
技術(shù)創(chuàng)新是電力行業(yè)發(fā)展的不竭動(dòng)力,電力工作者應(yīng)該加速現(xiàn)代科學(xué)技術(shù)的應(yīng)用工作,用適合的高新科技促進(jìn)城市電網(wǎng)對(duì)電能傳輸、分配和利用的高效性和合理性,確保城市電網(wǎng)在技術(shù)和安全管理的前提下實(shí)現(xiàn)安全、穩(wěn)定地運(yùn)行。
3.1 加速城市電網(wǎng)的升級(jí)改造
城市電網(wǎng)自動(dòng)化是目前城市電網(wǎng)中各項(xiàng)管理的基礎(chǔ),現(xiàn)階段城市電網(wǎng)運(yùn)行及維護(hù)的過(guò)程中,實(shí)現(xiàn)電力自動(dòng)化控制是主要的發(fā)展趨勢(shì),我們的研究人員應(yīng)該在這一過(guò)程中不斷提高電網(wǎng)運(yùn)行的安全技術(shù)水平。在實(shí)現(xiàn)城市電網(wǎng)自動(dòng)化改造過(guò)程中應(yīng)該利用科技提高安全效果的作用,既降低城市電網(wǎng)運(yùn)行人員和管理人員的工作強(qiáng)度,還可以有效避免人為事故的發(fā)展,達(dá)到在安全生產(chǎn)的基礎(chǔ)上有效維護(hù)和實(shí)現(xiàn)電網(wǎng)的安全和穩(wěn)定。
3.2 加強(qiáng)絕緣的動(dòng)態(tài)監(jiān)測(cè)
城市電網(wǎng)中絕緣性能的高低成為影響電網(wǎng)運(yùn)行安全的主要原因,從目前大量城市電網(wǎng)運(yùn)行及維護(hù)的實(shí)際工作來(lái)看,城市電網(wǎng)中出現(xiàn)故障和主要原因就是電網(wǎng)中的設(shè)備以及電纜的絕緣體性能不達(dá)標(biāo)造成的。因此,需要采用動(dòng)態(tài)監(jiān)測(cè)的方法對(duì)城市電網(wǎng)的絕緣性能進(jìn)行控制,方便在城市電網(wǎng)運(yùn)營(yíng)中及時(shí)掌握動(dòng)態(tài)的城市電網(wǎng)各設(shè)備的絕緣性能,為城市電網(wǎng)維護(hù)人員制定和實(shí)施維護(hù)方案提供輔助和參考,達(dá)到提高城市電網(wǎng)維護(hù)人員操作的安全性,在有效提高電網(wǎng)維護(hù)人員工作效率的基礎(chǔ)上,達(dá)到減短城市電網(wǎng)維修時(shí)間,降低停電損失,從而更好的維護(hù)了城市電網(wǎng)的穩(wěn)定性和安全性。
3.3 完善城市電網(wǎng)防護(hù)技術(shù)
在城市電網(wǎng)運(yùn)行維護(hù)安全管理中,我們的維護(hù)人員要避免在城市電網(wǎng)運(yùn)行和維護(hù)作業(yè)過(guò)程中出現(xiàn)的各種安全事故,如:觸電、高空墜落等。提高城市電網(wǎng)各類(lèi)運(yùn)行設(shè)備的維護(hù)安全管理技術(shù),應(yīng)該加強(qiáng)和完善提高城市電網(wǎng)運(yùn)行安全管理技術(shù)、安全標(biāo)準(zhǔn)以及安全控制體系等制度的確立,還要滿(mǎn)足目前城市電網(wǎng)運(yùn)行維護(hù)中的各項(xiàng)安全需求,保障城市電網(wǎng)在穩(wěn)定高效的狀態(tài)下安全地運(yùn)行。
結(jié)語(yǔ)
綜上所述,社會(huì)的發(fā)展和經(jīng)濟(jì)的發(fā)展與電力是分不開(kāi)的,電網(wǎng)運(yùn)行的可靠性和安全性會(huì)直接關(guān)系到人們正常的生產(chǎn)生活,不僅如此,還影響著市政項(xiàng)目的正常運(yùn)行,因此,必須強(qiáng)化城市電網(wǎng)在施工、養(yǎng)護(hù)和維修過(guò)程中各項(xiàng)工作,通過(guò)提高技術(shù)水平和管理質(zhì)量的綜合方式提高電網(wǎng)城市電網(wǎng)運(yùn)行和維護(hù)的效果。出于實(shí)際工作的限制和本人能力的水平,本文只對(duì)提高城市電網(wǎng)運(yùn)行安全管理的技術(shù)方面進(jìn)行了簡(jiǎn)述,提供了升級(jí)改造、動(dòng)態(tài)監(jiān)測(cè)和完善防護(hù)等技術(shù)方面的措施,相信對(duì)于很多直接影響到城市電網(wǎng)運(yùn)行安全管理的其他問(wèn)題尚未有設(shè)計(jì),在此,筆者建議后續(xù)研究者應(yīng)該在借鑒本文技術(shù)和安全管理工的基礎(chǔ)上,重點(diǎn)在企業(yè)安全文化建設(shè)和制度創(chuàng)新上加以探討,采用全面的分析辦法和綜合的措施,系統(tǒng)地提高城市電網(wǎng)運(yùn)行安全管理水平,達(dá)到確保城市電網(wǎng)安全性和可靠性,更好地為城市經(jīng)濟(jì)、居民生活和市政建設(shè)提供高品質(zhì)的電力資源。
參考文獻(xiàn)
[1]朱寶宗.S-Z絞用于電力電纜[A].中國(guó)電工技術(shù)學(xué)會(huì)電線(xiàn)電纜專(zhuān)委會(huì)、中國(guó)電機(jī)工程學(xué)會(huì)電力電纜分專(zhuān)委會(huì)交聯(lián)電纜專(zhuān)題研討會(huì)(2002年會(huì))論文集[C].2002.
[2]章春松,徐瑞寶,張安華.高壓客戶(hù)安全管理現(xiàn)狀分析及改進(jìn)思路[A].第十六屆(2008年)華東六省一市電機(jī)(電力)工程學(xué)會(huì)輸配電技術(shù)研討會(huì)論文集[C].2008.
[3]張如山.電氣設(shè)備中SF6氣體的安全管理措施[A].山東電機(jī)工程學(xué)會(huì)第五屆供電專(zhuān)業(yè)學(xué)術(shù)交流會(huì)論文集[C].2008.
[4]孫永旺.國(guó)產(chǎn)LW6系列斷路器調(diào)試及運(yùn)行維護(hù)中幾個(gè)值得注意的問(wèn)題[A].加入WTO和中國(guó)科技與可持續(xù)發(fā)展――挑戰(zhàn)與機(jī)遇、責(zé)任和對(duì)策(上冊(cè))[C].2002.
[5]魯尊強(qiáng),司志濤,于紅.調(diào)度自動(dòng)化系統(tǒng)的安全措施[A].淄博市第十一屆自然科學(xué)優(yōu)秀學(xué)術(shù)成果論文集[C].2008.
[6]閔勇,魯宗相,喬穎.風(fēng)電從“并網(wǎng)”到“融入”大電網(wǎng)運(yùn)行的轉(zhuǎn)變[A].2010年電力系統(tǒng)自動(dòng)化學(xué)術(shù)研討會(huì)論文集[C].2010.
[7]韓自?shī)^.甘肅電網(wǎng)氣象信息服務(wù)系統(tǒng)應(yīng)用功能探討[A].水電站梯級(jí)調(diào)度及自動(dòng)控制技術(shù)研討會(huì)論文集[C].2008.
[8]吳琛,李玲芳,張丹.滇西六地州電網(wǎng)安全運(yùn)行分析及措施研究[A].2007云南電力技術(shù)論壇論文集[C],2007.
[9]錢(qián)云,王永晨,胡義忠.淺議城鄉(xiāng)供配電電網(wǎng)發(fā)展戰(zhàn)略[A].第十六屆(2008年)華東六省一市電機(jī)(電力)工程學(xué)會(huì)輸配電技術(shù)研討會(huì)論文集[C].2008.
[10]劉建恩.改造后電網(wǎng)運(yùn)行的新特點(diǎn)[A].增強(qiáng)自主創(chuàng)新能力促進(jìn)吉林經(jīng)濟(jì)發(fā)展――啟明杯?吉林省第四屆科學(xué)技術(shù)學(xué)術(shù)年會(huì)論文集(上冊(cè))[C].2006.
篇9
關(guān)鍵詞:變電站;變壓器;安裝調(diào)試
1. 變電站調(diào)試概述
變電站中一次設(shè)備主要包括電力變壓器、斷路器、隔離開(kāi)關(guān)、接地刀閘、母線(xiàn)、電力電纜和輸電線(xiàn)路等。各個(gè)部件是否正常,一、二次回路是否正確,關(guān)系到變電站是否運(yùn)行正常,也關(guān)系到整個(gè)電力系統(tǒng)能否按技術(shù)要求正常工作。變電站一次設(shè)備在電網(wǎng)的運(yùn)行中擔(dān)負(fù)十分重要的任務(wù),所以需要我們認(rèn)真對(duì)待變電站內(nèi)設(shè)備的安裝以及調(diào)試工作,將事故的可能性降至最低。本文作者結(jié)合自身的工作經(jīng)驗(yàn)對(duì)變電站一次設(shè)備的安裝調(diào)試技術(shù)進(jìn)行了探討。
2.施工準(zhǔn)備
在變電站電力系統(tǒng)中一次設(shè)備施工時(shí),首先,要注重施工的科學(xué)性和系統(tǒng)性,要以現(xiàn)代化的管理理念來(lái)對(duì)施工進(jìn)行管理。施工現(xiàn)場(chǎng)管理人員嚴(yán)格按照國(guó)家的政策法規(guī)辦事,正確運(yùn)用有關(guān)的技術(shù)規(guī)范和標(biāo)準(zhǔn)。對(duì)于每道工序都不能掉以輕心,要嚴(yán)格要求。在變電站中電力系統(tǒng)的安裝和調(diào)試中,為了保證工程如期完工,要求土建、電力安裝和調(diào)試搞好合作,合理安排進(jìn)度并制定并做好安全措施。施工過(guò)程使用的電源宜采用接零保護(hù)系統(tǒng)引到現(xiàn)場(chǎng)。要保護(hù)好成品,盡量少返工,才能提高工作效率。按施工的實(shí)際情況與施工圖紙緊密結(jié)合,如發(fā)現(xiàn)不符要及時(shí)整改。
3.一 次設(shè)備的安裝
3.1 母線(xiàn)安裝
在安裝母線(xiàn)前要準(zhǔn)備一些工具用來(lái)校正和煨彎母線(xiàn),這些工具有時(shí)需要自己制作。安裝要用的母線(xiàn)有部分可能會(huì)變形,數(shù)量少時(shí)可手工校正,數(shù)量多時(shí)就要用母線(xiàn)校正機(jī)校正。方法就是把需要校正的母線(xiàn)放到機(jī)器上,用千斤頂將母線(xiàn)校正。在安裝過(guò)程中需要用彎曲的母線(xiàn),人為不能實(shí)現(xiàn)或彎曲度不夠需要用母線(xiàn)平彎?rùn)C(jī)校正。將母線(xiàn)用龍門(mén)壓力絲桿固定在平彎?rùn)C(jī)上,然后壓下手柄達(dá)到預(yù)想的彎度,這個(gè)中間可用樣板復(fù)核檢查。
3.2 電力電纜安裝
電力電纜在敷設(shè)過(guò)程中,要使電纜的彎曲半徑達(dá)到規(guī)范要求。電纜的標(biāo)識(shí)數(shù)量要充足,起始端、走向、型號(hào)、規(guī)格等標(biāo)識(shí)要清楚可辨認(rèn)。敷設(shè)電纜時(shí),35kV及以下的紙絕緣或全塑絕緣電纜,敷設(shè)時(shí)的平均最低溫度不能在零度以下,如果一定要敷設(shè)時(shí),則應(yīng)事先預(yù)熱電纜,但是禁止用火焰烘烤。
為了方便維修,防止電纜受機(jī)械損傷,應(yīng)做中間接頭,在電纜由垂直面引向水平面處、電纜保護(hù)管出口處和建筑物伸縮纏處及長(zhǎng)度較長(zhǎng)的電纜線(xiàn)路應(yīng)該留足夠長(zhǎng)度裕度,有條件可沿路徑做蛇形敷設(shè)。電纜敷設(shè)完工后,要在沿線(xiàn)設(shè)置電纜線(xiàn)路標(biāo)洗
3.3 變壓器安裝
變壓器安裝時(shí),一定要留意檢查高壓線(xiàn)包有沒(méi)有破損及移位現(xiàn)象,高壓絕緣子有沒(méi)有擦碰和損傷,濕控裝置包括濕度顯示儀表是否齊全。施工過(guò)程不能讓任何雜物進(jìn)入變壓器筒體內(nèi),還要看機(jī)體鐵心和箱體是否接地是否可靠,工作接地截面要規(guī)范符合要求,不能弄錯(cuò)變壓器就位高、低壓側(cè)的方向。變壓器要水平放置,安裝就位后加裝變壓器隔振器,然后安裝調(diào)壓器,測(cè)溫裝置和控制箱等附件。
整個(gè)安裝完成后,要檢查部件安裝是不是牢固,附件安裝是否正確。還要按廠家說(shuō)明書(shū)進(jìn)行調(diào)試,來(lái)檢測(cè)變壓器的完好與否。試驗(yàn)所用的儀器應(yīng)該在校驗(yàn)有效期內(nèi),測(cè)試后結(jié)果要如實(shí)在測(cè)試報(bào)告記錄。
3.4 斷路器安裝
安裝前要檢查斷路器絕緣外殼和操作手柄有沒(méi)有破損現(xiàn)象,還要看斷路器指示信號(hào)與電路分、合狀態(tài)是否符合。用螺絲刀擰下斷路器固定螺絲,將絕緣外殼上蓋和三相滅弧罩取下,然后將三相滅弧罩裝上,并扣上絕緣外殼上蓋,擰上四角的螺絲使其固定。合上斷路器,看斷路器指示是不是在“合”的位置:斷開(kāi)斷路器,看斷路器指示是不是在“分”的位置。
3.5 隔離開(kāi)關(guān)安裝
安裝在室外的隔離開(kāi)關(guān)安裝時(shí)應(yīng)保持水平,室內(nèi)的安裝要垂直,在受電柜里的安裝時(shí)如果使用電纜線(xiàn)那么接在電源動(dòng)觸頭那側(cè)。開(kāi)關(guān)兩側(cè)的接線(xiàn)一定要牢固。操作機(jī)構(gòu)的固定要牢固,安裝前需要手動(dòng)測(cè)試其開(kāi)合功能是否正常。還要看其限位裝置是否準(zhǔn)確可靠:開(kāi)關(guān)觸頭與觸頭的相對(duì)位置和開(kāi)閘時(shí)拉開(kāi)的角度是不是達(dá)到要求;觸頭表面要干凈整潔并要涂保護(hù)層:輔助的開(kāi)關(guān)安裝也要牢固,操作要準(zhǔn)確。
4.變電所設(shè)備調(diào)試
變電站一次設(shè)備的調(diào)試工作在施工中十分重要,設(shè)備調(diào)試結(jié)果是否合格直接關(guān)系到變電站能否正常安全受電和運(yùn)行,是變電站施工中的關(guān)鍵工序,必須給予高度重視。
4.1 母線(xiàn)的調(diào)試及維護(hù)
1)檢查導(dǎo)線(xiàn)、金具有沒(méi)有破損、是不是光滑,接頭有沒(méi)有過(guò)熱現(xiàn)象。檢查母線(xiàn)是不是過(guò)熱,可以看母線(xiàn)變色漆處或示溫片有沒(méi)有變色。對(duì)于接頭處電流量大的,接頭處的溫度可以用紅外線(xiàn)測(cè)溫儀測(cè)量,如果測(cè)試溫度超出此類(lèi)母線(xiàn)的既定溫度值時(shí)應(yīng)減少負(fù)荷或停止運(yùn)行。
2)可以每隔半年到一年清掃一次母線(xiàn)、絕緣子,特別是臟亂差的地區(qū),更應(yīng)增多清掃工作的次數(shù)。對(duì)于線(xiàn)夾是否牢固的檢查應(yīng)該做到每隔兩年一次。在電氣設(shè)備檢修的同時(shí)要對(duì)母線(xiàn)進(jìn)行護(hù)理,更換生銹斑的螺栓和部件并刷防護(hù)漆。
3)在進(jìn)行配電裝置測(cè)試檢查和維修的同時(shí),可以看看母線(xiàn)接頭、金具是否還是保持緊固和完整。對(duì)運(yùn)行情況不好的部件要及時(shí)修復(fù)。
4.2 電力電纜的調(diào)試
1)每年春天和秋天兩個(gè)季節(jié)對(duì)室內(nèi)、外電纜終端頭進(jìn)行檢查,要清除塵土、油污,并檢查絕緣套管有沒(méi)有破損,接頭有沒(méi)有過(guò)熱、流油、流膠等現(xiàn)象。每周應(yīng)沿著電纜走向來(lái)回檢查一次,將標(biāo)樁補(bǔ)齊,有損壞的蓋板要及時(shí)更換,堵住通往電纜溝的入水口。
2)電纜周?chē)┕?dòng)土要派專(zhuān)人監(jiān)察防護(hù),以免發(fā)生電纜弄破及人身觸電事故。
3)在搖測(cè)絕緣電阻或做預(yù)防性試驗(yàn)時(shí),電纜與設(shè)備接頭處必須清除灰塵和油污,保證結(jié)果準(zhǔn)確,測(cè)試結(jié)果如與上次結(jié)果有明顯差別時(shí),要檢查外露電纜有無(wú)破損、漏油、放電現(xiàn)象,必要時(shí)要進(jìn)行分段檢查,或者更新終端頭。
4.3 電力變壓器的調(diào)試
1)測(cè)量繞組的直流電阻,看其是否合乎規(guī)格。
2)檢查所有分接頭的變壓比和廠家提供的規(guī)格數(shù)據(jù)相同,并應(yīng)符合其規(guī)律:
3)檢查變壓器的三相結(jié)線(xiàn)組別應(yīng)符合設(shè)計(jì)要求及銘牌上的標(biāo)記;
4)測(cè)量繞組的絕緣電阻及吸收比,絕緣電阻值不能比出廠值的70%低,吸收比要與出廠值沒(méi)有太大差別。在室溫下不能比1.3少:測(cè)量繞組的直流泄漏電流;
5)繞組的工頻耐壓試驗(yàn),當(dāng)變壓器容量特別大時(shí),可做直流耐壓試驗(yàn)。
4.4 斷路器調(diào)試內(nèi)容
調(diào)試斷路器時(shí),要測(cè)量絕緣拉桿的絕緣電阻、成分是有機(jī)物的絕緣拉桿的絕緣電阻、測(cè)量每相導(dǎo)電回路的直流電阻、測(cè)量分、合閘線(xiàn)圈的直流電阻和絕緣電阻、測(cè)量斷路器的分、合閘時(shí)間、測(cè)量斷路器合閘時(shí)觸頭的彈跳時(shí)間、測(cè)量斷路器主觸頭分、合閘的同期性、測(cè)量斷路器分、合閘線(xiàn)圈的最低動(dòng)作值、工頻耐壓試驗(yàn)。
4.5 隔離開(kāi)關(guān)調(diào)試
初次操作開(kāi)關(guān)時(shí),開(kāi)合閘要緩慢。合閘期間要看觸刀有沒(méi)有側(cè)向
撞擊,如有這種情況,要進(jìn)行調(diào)整使觸刀片正好能插入觸頭。觸刀插入觸頭的深度要合適。防止觸刀碰到絕緣子的端部。觸刀與觸頭的底部要有三到五厘米的空隙,不然就需調(diào)整連桿的長(zhǎng)度或者調(diào)整改變軸的旋轉(zhuǎn)角度,來(lái)改變觸刀插入的深度。調(diào)整兩邊的彈簧壓力,使觸刀接觸狀況
合乎符合規(guī)定。
篇10
第二條本細(xì)則適用于中華人民共和國(guó)境內(nèi)國(guó)有、集體、外資、合資、個(gè)人已建或在建的電力設(shè)施。
第三條電力管理部門(mén)、公安部門(mén)、電力企業(yè)和人民群眾都有保護(hù)電力設(shè)施的義務(wù)。各級(jí)地方人民政府設(shè)立的由同級(jí)人民政府所屬有關(guān)部門(mén)和電力企業(yè)(包括:電網(wǎng)經(jīng)營(yíng)企業(yè)、供電企業(yè)、發(fā)電企業(yè))負(fù)責(zé)人組成的電力設(shè)施保護(hù)領(lǐng)導(dǎo)小組,負(fù)責(zé)領(lǐng)導(dǎo)所轄行政區(qū)域內(nèi)電力設(shè)施的保護(hù)工作,其辦事機(jī)構(gòu)設(shè)在相應(yīng)的電網(wǎng)經(jīng)營(yíng)企業(yè),負(fù)責(zé)電力設(shè)施保護(hù)的日常工作。
電力設(shè)施保護(hù)領(lǐng)導(dǎo)小組,應(yīng)當(dāng)在有關(guān)電力線(xiàn)路沿線(xiàn)組織群眾護(hù)線(xiàn),群眾護(hù)線(xiàn)組織成員由相應(yīng)的電力設(shè)施保護(hù)領(lǐng)導(dǎo)小組發(fā)給護(hù)線(xiàn)證件。
各?。ㄗ灾螀^(qū)、直轄市)電力管理部門(mén)可制定辦法,規(guī)定群眾護(hù)線(xiàn)組織形式、權(quán)利、義務(wù)、責(zé)任等。
第四條電力企業(yè)必須加強(qiáng)對(duì)電力設(shè)施的保護(hù)工作。對(duì)危害電力設(shè)施安全的行為,電力企業(yè)有權(quán)制止并可以勸其改正、責(zé)其恢復(fù)原狀、強(qiáng)行排除妨害,責(zé)令賠償損失、請(qǐng)求有關(guān)行政主管部門(mén)和司法機(jī)關(guān)處理,以及采取法律、法規(guī)或政府授權(quán)的其他必要手段。
第五條架空電力線(xiàn)路保護(hù)區(qū),是為了保證已建架空電力線(xiàn)路的安全運(yùn)行和保障人民生活的正常供電而必須設(shè)置的安全區(qū)域。在廠礦、城鎮(zhèn)、集鎮(zhèn)、村莊等人口密集地區(qū),架空電力線(xiàn)路保護(hù)區(qū)為導(dǎo)線(xiàn)邊線(xiàn)在最大計(jì)算風(fēng)偏后的水平距離和風(fēng)偏后距建筑物的水平安全距離之和所形成的兩平行線(xiàn)內(nèi)的區(qū)域。各級(jí)電壓導(dǎo)線(xiàn)邊線(xiàn)在計(jì)算導(dǎo)線(xiàn)最大風(fēng)偏情況下,距建筑物的水平安全距離如下:
*
第六條江河電纜保護(hù)區(qū)的寬度為:
(一)敷設(shè)于二級(jí)及以上航道時(shí),為線(xiàn)路兩側(cè)各100米所形成的兩平行線(xiàn)內(nèi)的水域;
(二)敷設(shè)于三級(jí)及以下航道時(shí),為線(xiàn)路兩側(cè)各50米所形成的兩平行線(xiàn)內(nèi)的水域。
第七條地下電力電纜保護(hù)區(qū)的寬度為地下電力電纜線(xiàn)路地面標(biāo)樁兩側(cè)各0.75米所形成兩平行線(xiàn)內(nèi)區(qū)域。
發(fā)電設(shè)施附屬的輸油、輸灰、輸水管線(xiàn)的保護(hù)區(qū)依本條規(guī)定確定。
在保護(hù)區(qū)內(nèi)禁止使用機(jī)械掘土、種植林木;禁止挖坑、取土、興建建筑物和構(gòu)筑物;不得堆放雜物或傾倒酸、堿、鹽及其他有害化學(xué)物品。
第八條禁止在電力電纜溝內(nèi)同時(shí)埋設(shè)其他管道。未經(jīng)電力企業(yè)同意,不準(zhǔn)在地下電力電纜溝內(nèi)埋設(shè)輸油、輸氣等易燃易爆管道。管道交叉通過(guò)時(shí),有關(guān)單位應(yīng)當(dāng)協(xié)商,并采取安全措施,達(dá)成協(xié)議后方可施工。
第九條電力管理部門(mén)應(yīng)在下列地點(diǎn)設(shè)置安全標(biāo)志:
(一)架空電力線(xiàn)路穿越的人口密集地段;
(二)架空電力線(xiàn)路穿越的人員活動(dòng)頻繁的地區(qū);
(三)車(chē)輛、機(jī)械頻繁穿越架空電力線(xiàn)路的地段;
(四)電力線(xiàn)路上的變壓器平臺(tái)。
第十條任何單位和個(gè)人不得在距電力設(shè)施周?chē)灏倜追秶鷥?nèi)(指水平距離)進(jìn)行爆破作業(yè)。因工作需要必須進(jìn)行爆破作業(yè)時(shí),應(yīng)當(dāng)按國(guó)家頒發(fā)的有關(guān)爆破作業(yè)的法律法規(guī),采取可靠的安全防范措施,確保電力設(shè)施安全,并征得當(dāng)?shù)仉娏υO(shè)施產(chǎn)權(quán)單位或管理部門(mén)的書(shū)面同意,報(bào)經(jīng)政府有關(guān)管理部門(mén)批準(zhǔn)。
在規(guī)定范圍外進(jìn)行的爆破作業(yè)必須確保電力設(shè)施的安全。
第十一條任何單位或個(gè)人不得沖擊、擾亂發(fā)電、供電企業(yè)的生產(chǎn)和工作秩序,不得移動(dòng)、損害生產(chǎn)場(chǎng)所的生產(chǎn)設(shè)施及標(biāo)志物。
第十二條任何單位或個(gè)人不得在距架空電力線(xiàn)路桿塔、拉線(xiàn)基礎(chǔ)外緣的下列范圍內(nèi)進(jìn)行取土、打樁、鉆探、開(kāi)挖或傾倒酸、堿、鹽及其他有害化學(xué)物品的活動(dòng):
(一)35千伏及以下電力線(xiàn)路桿塔、拉線(xiàn)周?chē)?米的區(qū)域;
(二)66千伏及以上電力線(xiàn)路桿塔、拉線(xiàn)周?chē)?0米的區(qū)域。
在桿塔、拉線(xiàn)基礎(chǔ)的上述距離范圍外進(jìn)行取土、堆物、打樁、鉆探、開(kāi)挖活動(dòng)時(shí),必須遵守下列要求:
(一)預(yù)留出通往桿塔、拉線(xiàn)基礎(chǔ)供巡視和檢修人員、車(chē)輛通行的道路;
(二)不得影響基礎(chǔ)的穩(wěn)定,如可能引起基礎(chǔ)周?chē)寥?、砂石滑坡,進(jìn)行上述活動(dòng)的單位或個(gè)人應(yīng)當(dāng)負(fù)責(zé)修筑護(hù)坡加固;
(三)不得損壞電力設(shè)施接地裝置或改變其埋設(shè)深度。
第十三條在架空電力線(xiàn)路保護(hù)區(qū)內(nèi),任何單位或個(gè)人不得種植可能危及電力設(shè)施和供電安全的樹(shù)木、竹子等高桿植物。
第十四條超過(guò)4米高度的車(chē)輛或機(jī)械通過(guò)架空電力線(xiàn)路時(shí),必須采取安全措施,并經(jīng)縣級(jí)以上的電力管理部門(mén)批準(zhǔn)。
第十五條架空電力線(xiàn)路一般不得跨越房屋。對(duì)架空電力線(xiàn)路通道內(nèi)的原有房屋,架空電力線(xiàn)路建設(shè)單位應(yīng)當(dāng)與房屋產(chǎn)權(quán)所有者協(xié)商搬遷,拆遷費(fèi)不得超出國(guó)家規(guī)定標(biāo)準(zhǔn);特殊情況需要跨越房屋時(shí),設(shè)計(jì)建設(shè)單位應(yīng)當(dāng)采取增加桿塔高度、縮短檔距等安全措施,以保證被跨越房屋的安全。被跨越房屋不得再行增加高度。超越房屋的物體高度或房屋周邊延伸出的物體長(zhǎng)度必須符合安全距離的要求。
第十六條架空電力線(xiàn)路建設(shè)項(xiàng)目和公用工程、城市綠化及其他工程之間發(fā)生妨礙時(shí),按下述原則處理:
(一)新建架空電力線(xiàn)路建設(shè)工程、項(xiàng)目需穿過(guò)林區(qū)時(shí),應(yīng)當(dāng)按國(guó)家有關(guān)電力設(shè)計(jì)的規(guī)程砍伐出通道,通道內(nèi)不得再種植樹(shù)木;對(duì)需砍伐的樹(shù)木由架空電力線(xiàn)路建設(shè)單位按國(guó)家的規(guī)定辦理手續(xù)和付給樹(shù)木所有者一次性補(bǔ)償費(fèi)用,并與其簽定不再在通道內(nèi)種植樹(shù)木的協(xié)議。
(二)架空電力線(xiàn)路建設(shè)項(xiàng)目、計(jì)劃已經(jīng)當(dāng)?shù)爻鞘薪ㄔO(shè)規(guī)劃主管部門(mén)批準(zhǔn)的,園林部門(mén)對(duì)影響架空電力線(xiàn)路安全運(yùn)行的樹(shù)木,應(yīng)當(dāng)負(fù)責(zé)修剪,并保持今后樹(shù)木自然生長(zhǎng)最終高度和架空電力線(xiàn)路導(dǎo)線(xiàn)之間的距離符合安全距離的要求。
(三)根據(jù)城市綠化規(guī)劃的要求,必須在已建架空電力線(xiàn)路保護(hù)區(qū)內(nèi)種植樹(shù)木時(shí),園林部門(mén)需與電力管理部門(mén)協(xié)商,征得同意后,可種植低矮樹(shù)種,并由園林部門(mén)負(fù)責(zé)修剪以保持樹(shù)木自然生長(zhǎng)最終高度和架空電力線(xiàn)路導(dǎo)線(xiàn)之間的距離符合安全距離的要求。
(四)架空電力線(xiàn)路導(dǎo)線(xiàn)在最大弧垂或最大風(fēng)偏后與樹(shù)木之間的安全距離為:
*
對(duì)不符合上述要求的樹(shù)木應(yīng)當(dāng)依法進(jìn)行修剪或砍伐,所需費(fèi)用由樹(shù)木所有者負(fù)擔(dān)。
第十七條城鄉(xiāng)建設(shè)規(guī)劃主管部門(mén)審批或規(guī)劃已建電力設(shè)施(或已經(jīng)批準(zhǔn)新建、改建、擴(kuò)建、規(guī)劃的電力設(shè)施)兩側(cè)的新建建筑物時(shí),應(yīng)當(dāng)會(huì)同當(dāng)?shù)仉娏芾聿块T(mén)審查后批準(zhǔn)。
第十八條在依法劃定的電力設(shè)施保護(hù)區(qū)內(nèi),任何單位和個(gè)人不得種植危及電力設(shè)施安全的樹(shù)木、竹子或高桿植物。
電力企業(yè)對(duì)已劃定的電力設(shè)施保護(hù)區(qū)域內(nèi)新種植或自然生長(zhǎng)的可能危及電力設(shè)施安全的樹(shù)木、竹子,應(yīng)當(dāng)予以砍伐,并不予支付林木補(bǔ)償費(fèi)、林地補(bǔ)償費(fèi)、植被恢復(fù)費(fèi)等任何費(fèi)用。
第十九條電力管理部門(mén)對(duì)檢舉、揭發(fā)破壞電力設(shè)施或哄搶、盜竊電力設(shè)施器材的行為符合事實(shí)的單位或個(gè)人,給予2000元以下的獎(jiǎng)勵(lì);對(duì)同破壞電力設(shè)施或哄搶、盜竊電力設(shè)施器材的行為進(jìn)行斗爭(zhēng)并防止事故發(fā)生的單位或個(gè)人,給予2000元以上的獎(jiǎng)勵(lì);對(duì)為保護(hù)電力設(shè)施與自然災(zāi)害作斗爭(zhēng),成績(jī)突出或?yàn)榫S護(hù)電力設(shè)施安全做出顯著成績(jī)的單位或個(gè)人,根據(jù)貢獻(xiàn)大小,給予相應(yīng)物質(zhì)獎(jiǎng)勵(lì)。
對(duì)維護(hù)、保護(hù)電力設(shè)施作出重大貢獻(xiàn)的單位或個(gè)人,除按以上規(guī)定給予物質(zhì)獎(jiǎng)勵(lì)外,還可由電力管理部門(mén)、公安部門(mén)或當(dāng)?shù)厝嗣裾鶕?jù)各自的權(quán)限給予表彰或榮譽(yù)獎(jiǎng)勵(lì)。
第二十條下列危害電力設(shè)施的行為,情節(jié)顯著輕微的,由電力管理部門(mén)責(zé)令改正;拒不改正的,處1000元以上10000元以下罰款:
(一)損壞使用中的桿塔基礎(chǔ)的;
(二)損壞、拆卸、盜竊使用中或備用塔材、導(dǎo)線(xiàn)等電力設(shè)施的;
(三)拆卸、盜竊使用中或備用變壓器等電力設(shè)備的。破壞電力設(shè)備、危害公共安全構(gòu)成犯罪的,依法追究其刑事責(zé)任。
第二十一條下列違反《電力設(shè)施保護(hù)條例》和本細(xì)則的行為,尚不構(gòu)成犯罪的,由公安機(jī)關(guān)依據(jù)《中華人民共和國(guó)治安管理處罰條例》予以處理:
(一)盜竊、哄搶庫(kù)存或者已廢棄停止使用的電力設(shè)施器材的;
(二)盜竊、哄搶尚未安裝完畢或尚未交付使用單位驗(yàn)收的電力設(shè)施的。
熱門(mén)標(biāo)簽
電力營(yíng)銷(xiāo)論文 電力市場(chǎng)論文 電力電子論文 電力工程論文 電力企業(yè)論文 電力技術(shù)論文 電力管理論文 電力系統(tǒng)分析 電力調(diào)研報(bào)告 電力整改措施 心理培訓(xùn) 人文科學(xué)概論
相關(guān)文章
1數(shù)字經(jīng)濟(jì)時(shí)代電力企業(yè)財(cái)務(wù)探討
2綠色電力理念的應(yīng)用化學(xué)人才培養(yǎng)研究